The standard operating plan must include the following:

1. General information on the dam and reservoir including the history, a description of the project, persons responsible, agreements with other entities, and the purpose of the project.

2. Inspection list detailing what items should be inspected routinely by the owner or his agent.

3. Routine maintenance schedule and procedures such as rodent removal, vegetation control, floating debris removal, lubrication, painting, grading, riprap repair, and erosion repair.

4. Outlet and spillway operation including operation and maintenance of any mechanical, hydraulic, or electrical systems used. Emergency or back-up procedures should be included.

5. Instrumentation operation including threshold values, reading schedules, reporting procedures, and maintenance.

6. Reservoir operation including descriptions of controlling floatable debris, monitoring unstable soils, control of sediment, public access, and inundation areas.

7. Safety and health hazards and procedures to mitigate the hazards.

8. Recordkeeping and reporting procedures including necessary forms and examples.

9. A copy of the record or as-constructed drawings shall be included.

Disclaimer: These regulations may not be the most recent version. Utah may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.