1. Prior to the commencement of any activity authorized by a materials permit the permittee shall be required to submit, for the director's approval, a plan of operations which shall include the following:
(a) A map
or plat showing
i) the location and sequence
of areas from which material is to be excavated;
ii) the location of any processing or
stationary equipment or improvements which will be placed on the premises;
iii) transportation and access
routes across the premises and adjacent properties;
iv) the location of any fuel storage tanks;
and,
v) the location of stockpile
areas.
(b) Elevation
drawings of the premises before and after the excavation of
materials.
(c) Reclamation plans
prepared by any governmental agency, or if not acceptable to the director, as
required by the director.
Disclaimer: These regulations may not be the most recent version. Utah may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.