Utah Administrative Code
Topic - Natural Resources
Title R649 - Oil, Gas and Mining; Oil and Gas
Rule R649-3 - Drilling and Operating Practices
Section R649-3-23 - Well Workover and Recompletion
Current through Bulletin 2024-18, September 15, 2024
1. Requests for approval of a notice of intention to perform a workover or recompletion shall be filed by an operator with the division on Form 9, Sundry Notices and Reports on Wells, or if the operation includes substantial redrilling, deepening, or plugging back of an existing well, on Form 3, Application for Permit to Drill, Deepen or Plug Back.
2. The division shall review the proposed workover or recompletion for conformance with the Oil and Gas Conservation General Rules and advise the operator of its decision and necessary conditions of approval.
3. Recompletions shall be conducted in a manner to protect the original completion interval and other known productive intervals.
4. The same tests and reports are required for well recompletion as are required following an original well completion.
5. The applicant shall file a subsequent report of workover on Form 9, Sundry Notices and Reports, or a subsequent report of recompletion on Form 8, Well Completion or Recompletion Report and Log, within 30 days after completing the workover or recompletion operations.
6. To qualify for a tax credit under Subsection 59-5-102(7), the operator on their behalf and on behalf of each working interest owner must file a request with the division on Form 15, Designation of Workover or Recompletion. The request must be filed within 180 days after completing the workover or recompletion operations.
7. A workover which may qualify under Subsection 59-5-102(7) shall be downhole operations conducted to maintain, restore or increase the producibility or serviceability of a well in the geologic interval that the well is currently completed in, but shall not include:
8. A recompletion that may qualify under Subsection 59-5-102(7) shall be downhole operations conducted to reestablish producibility or serviceability of a well in any geologic interval.
9. The division shall review the request for designation of a workover or recompletion and advise the operator and the State Tax Commission of its decision to approve or deny the operations for the purposes of Subsection 59-5-102(7).
10. The division is responsible for approval of workover and recompletion operations that qualify for the tax credit.