1. Except for the tolerances allowed under Subsection R649-3-10, no well may be intentionally deviated unless the operator shall first file application and obtain approval from the division.
1.1. An application for directional drilling
may be approved by the division without notice and hearing when the applicant
is the owner of any oil and gas within a radius of 460 feet from any points
along the intended well bore, or the applicant has obtained the written consent
of the owner to the proposed directional drilling program.
1.2. An application pertaining to a well with
a surface location outside the tolerances allowed by Subsection
R649-3-2 or the appropriate board order, but with the point of penetration of the
targeted productive zone and bottom hole location within said tolerances, may
be approved by the division without notice and hearing conditioned upon the
operator filing a certification included with the application that it will not
perforate and complete the well in any other zone outside of said tolerances
without complying with the requirements of Subsection R649-3-11.1.1. Under
these circumstances, no additional exception location approval under Subsection
R649-3-3 is required.
1.3. An application
for directional drilling may be included as part of the initial APD for a
proposed well.
2. An application for directional drilling shall include the following information:
2.1. The name and address of the
operator.
2.2. The lease name, well
number, field name, reservoir name, and county where the proposed well is
located.
2.3. A plat or sketch
showing the distance from the surface location to section and lease lines, the
target location within the intended producing interval, and any point along the
intended well bore outside the 460 foot radius for which the consent of the
owner has been obtained.
2.4. The
reason for the intentional deviation.
2.5. The signature of designated agent or
representative of operator.
3. Within 30 days following completion of a directionally drilled well, a complete angular deviation and directional survey of the well obtained by an approved well survey company shall be filed with the division, together with other regularly required reports.
Disclaimer: These regulations may not be the most recent version. Utah may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.