Current through Bulletin 2024-06, March 15, 2024
(a) Each owner or operator of a CCR unit
subject to the requirements of Sections R315-319-50 through 107 shall maintain
a publicly accessible Internet site, CCR Web site, containing the information
specified in Section R315-319-107. The owner or operator's Web site shall be
titled "CCR Rule Compliance Data and Information."
(b) An owner or operator of more than one CCR
unit subject to the provisions of Sections R315-319-50 through 107 may comply
with the requirements of Section R315-319-107 by using the same Internet site
for multiple CCR units provided the CCR Web site clearly delineates information
by the name or identification number of each unit.
(c) Unless otherwise required in Section
R315-319-107, the information required to be posted to the CCR Web site shall
be made available to the public for at least five years following the date on
which the information was first posted to the CCR Web site.
(d) Unless otherwise required in Section
R315-319-107, the information shall be posted to the CCR Web site within 30
days of placing the pertinent information required by Subsection R315-319-105
in the operating record.
(e)
Location restrictions. The owner or operator of a CCR unit subject to Sections
R315-319-50 through 107 shall place each demonstration specified under
Subsection R315-319-105(e) on the owner or operator's CCR Web site.
(f) Design criteria. The owner or operator of
a CCR unit subject to Sections R315-319-50 through 107 shall place the
following information on the owner or operator's CCR Web site:
(1) Within 60 days of commencing construction
of a new unit, the design certification specified under Subsection
R315-319-105(f)(1) or (3).
(2) No
later than the date of initial receipt of CCR by a new CCR unit, the
construction certification specified under Subsection R315-319-105(f)(1) or
(3).
(3) The documentation of liner
type specified under Subsection R315-319-105(f)(2).
(4) The initial and periodic hazard potential
classification assessments specified under Subsection
R315-319-105(f)(5).
(5) The
emergency action plan (EAP) specified under Subsection R315-319-105(f)(6),
except that only the most recent EAP shall be maintained on the CCR Web site
irrespective of the time requirement specified in Subsection
R315-319-107(c).
(6) Documentation
prepared by the owner or operator recording the annual face-to-face meeting or
exercise between representatives of the owner or operator of the CCR unit and
the local emergency responders specified under Subsection
R315-319-105(f)(7).
(7)
Documentation prepared by the owner or operator recording any activation of the
emergency action plan specified under Subsection R315-319-105(f)(8).
(8) The history of construction, and any
revisions of it, specified under Subsection R315-319-105(f)(9).
(9) The initial and periodic structural
stability assessments specified under Subsection R315-319-105(f)(10).
(10) The documentation detailing the
corrective measures taken to remedy the deficiency or release specified under
Subsection R315-319-105(f)(11).
(11) The initial and periodic safety factor
assessments specified under Subsection R315-319-105(f)(12).
(12) The design and construction plans, and
any revisions of them, specified under Subsection
R315-319-105(f)(13).
(g)
Operating criteria. The owner or operator of a CCR unit subject to Sections
R315-319-50 through 107 shall place the following information on the owner or
operator's CCR Web site:
(1) The CCR fugitive
dust control plan, or any subsequent amendment of the plan, specified under
Subsection R315-319-105(g)(1) except that only the most recent plan shall be
maintained on the CCR Web site irrespective of the time requirement specified
in Subsection R315-319-107(c).
(2)
The annual CCR fugitive dust control report specified under Subsection
R315-319-105(g)(2).
(3) The initial
and periodic run-on and run-off control system plans specified under Subsection
R315-319-105(g)(3).
(4) The initial
and periodic inflow design flood control system plans specified under
Subsection R315-319-105(g)(4).
(5)
The periodic inspection reports specified under Subsection
R315-319-105(g)(6).
(6) The
documentation detailing the corrective measures taken to remedy the deficiency
or release specified under Subsection R315-319-105(g)(7).
(7) The periodic inspection reports specified
under Subsection R315-319-105(g)(9).
(h) Groundwater monitoring and corrective
action. The owner or operator of a CCR unit subject to Sections R315-319-50
through 107 shall place the following information on the owner or operator's
CCR Web site:
(1) The annual groundwater
monitoring and corrective action report specified under Subsection
R315-319-105(h)(1).
(2) The
groundwater monitoring system certification specified under Subsection
R315-319-105(h)(3).
(3) The
selection of a statistical method certification specified under Subsection
R315-319-105(h)(4).
(4) The
notification that an assessment monitoring programs has been established
specified under Subsection R315-319-105(h)(5).
(5) The notification that the CCR unit is
returning to a detection monitoring program specified under Subsection
R315-319-105(h)(7).
(6) The
notification that one or more constituents in appendix IV to Rule R315-319 have
been detected at statistically significant levels above the groundwater
protection standard and the notifications to land owners specified under
Subsection R315-319-105(h)(8).
(7)
The notification that an assessment of corrective measures has been initiated
specified under Subsection R315-319-105(h)(9).
(8) The assessment of corrective measures
specified under Subsection R315-319-105(h)(10).
(9) The semiannual reports describing the
progress in selecting and designing remedy and the selection of remedy report
specified under Subsection R315-319-105(h)(12), except that the selection of
the remedy report shall be maintained until the remedy has been
completed.
(10) The notification
that the remedy has been completed specified under Subsection
R315-319-105(h)(13).
(i)
Closure and post-closure care. The owner or operator of a CCR unit subject to
Sections R315-319-50 through 107 shall place the following information on the
owner or operator's CCR Web site:
(1) The
notification of intent to initiate closure of the CCR unit specified under
Subsection R315-319-105(i)(1).
(2)
The annual progress reports of closure implementation specified under
Subsection R315-319-105(i)(2).
(3)
The notification of closure completion specified under Subsection
R315-319-105(i)(3).
(4) The written
closure plan, and any amendment of the plan, specified under Subsection
R315-319-105(i)(4).
(5) The
demonstration(s) for a time extension for initiating closure specified under
Subsection R315-319-105(i)(5).
(6)
The demonstration(s) for a time extension for completing closure specified
under Subsection R315-319-105(i)(6).
(7) The notification of intent to close a CCR
unit specified under Subsection R315-319-105(i)(7).
(8) The notification of completion of closure
of a CCR unit specified under Subsection R315-319-105(i)(8).
(9) The notification recording a notation on
the deed as required by Subsection R315-319-105(i)(9).
(10) The notification of intent to comply
with the alternative closure requirements as required by Subsection
R315-319-105(i)(10).
(11) The
annual progress reports under the alternative closure requirements as required
by Subsection R315-319-105(i)(11).
(12) The written post-closure plan, and any
amendment of the plan, specified under Subsection
R315-319-105(i)(12).
(13) The
notification of completion of post-closure care specified under Subsection
R315-319-105(i)(13).
(j)
Retrofit criteria. The owner or operator of a CCR unit subject to Sections
R315-319-50 through 107 shall place the following information on the owner or
operator's CCR Web site:
(1) The written
retrofit plan, and any amendment of the plan, specified under Subsection
R315-319-105(j)(1).
(2) The
notification of intent to comply with the alternative retrofit requirements as
required by Subsection R315-319-105(j)(2).
(3) The annual progress reports under the
alternative retrofit requirements as required by Subsection
R315-319-105(j)(3).
(4) The
demonstration(s) for a time extension for completing retrofit activities
specified under Subsection R315-319-105(j)(4).
(5) The notification of intent to retrofit a
CCR unit specified under Subsection R315-319-105(j)(5).
(6) The notification of completion of
retrofit activities specified under Subsection R315-319-105(j)(6).