Current through Bulletin 2024-06, March 15, 2024
(a) The
notifications required under Subsections R315-319-106(e) through (i) shall be
sent to the Director before the close of business on the day the notification
is required to be completed. For purposes of Section R315-319-106, before the
close of business means the notification shall be postmarked or sent by
electronic mail (email). If a notification deadline falls on a weekend or
federal holiday, the notification deadline is automatically extended to the
next business day.
(c) Notifications may be
combined as long as the deadline requirement for each notification is
met.
(d) Unless otherwise required
in Section R315-319-106, the notifications specified in Section R315-319-106
shall be sent to the Director within 30 days of placing in the operating record
the information required by Subsection R315-319-105.
(e) Location restrictions. The owner or
operator of a CCR unit subject to the requirements of Sections R315-319-50
through 107 shall notify the Director that each demonstration specified under
Subsection R315-319-105(e) has been placed in the operating record and on the
owner or operator's publicly accessible internet site.
(f) Design criteria. The owner or operator of
a CCR unit subject to Sections R315-319-50 through 107 shall notify the
Director when information has been placed in the operating record and on the
owner or operator's publicly accessible Internet site. The owner or operator
shall:
(1) Within 60 days of commencing
construction of a new CCR unit, provide notification of the availability of the
design certification specified under Subsection R315-319-105(f)(1) or (3). If
the owner or operator of the CCR unit elects to install an alternative
composite liner, the owner or operator shall also submit to the Director a copy
of the alternative composite liner design.
(2) No later than the date of initial receipt
of CCR by a new CCR unit, provide notification of the availability of the
construction certification specified under Subsection R315-319-105(f)(1) or
(3).
(3) Provide notification of
the availability of the documentation of liner type specified under Subsection
R315-319-105(f)(2).
(4) Provide
notification of the availability of the initial and periodic hazard potential
classification assessments specified under Subsection
R315-319-105(f)(5).
(5) Provide
notification of the availability of emergency action plan (EAP), and any
revisions of the EAP, specified under Subsection R315-319-105(f)(6).
(6) Provide notification of the availability
of documentation prepared by the owner or operator recording the annual
face-to-face meeting or exercise between representatives of the owner or
operator of the CCR unit and the local emergency responders specified under
Subsection R315-319-105(f)(7).
(7)
Provide notification of documentation prepared by the owner or operator
recording all activations of the emergency action plan specified under
Subsection R315-319-105(f)(8).
(8)
Provide notification of the availability of the history of construction, and
any revision of it, specified under Subsection R315-319-105(f)(9).
(9) Provide notification of the availability
of the initial and periodic structural stability assessments specified under
Subsection R315-319-105(f)(10).
(10) Provide notification of the availability
of the documentation detailing the corrective measures taken to remedy the
deficiency or release specified under Subsection R315-319-105(f)(11).
(11) Provide notification of the availability
of the initial and periodic safety factor assessments specified under
Subsection R315-319-105(f)(12).
(12) Provide notification of the availability
of the design and construction plans, and any revision of them, specified under
Subsection R315-319-105(f)(13).
(g) Operating criteria. The owner or operator
of a CCR unit subject to Sections R315-319-50 through 107 shall notify the
Director when information has been placed in the operating record and on the
owner or operator's publicly accessible Internet site. The owner or operator
shall:
(1) Provide notification of the
availability of the CCR fugitive dust control plan, or any subsequent amendment
of the plan, specified under Subsection R315-319-105(g)(1).
(2) Provide notification of the availability
of the annual CCR fugitive dust control report specified under Subsection
R315-319-105(g)(2).
(3) Provide
notification of the availability of the initial and periodic run-on and run-off
control system plans specified under Subsection R315-319-105(g)(3).
(4) Provide notification of the availability
of the initial and periodic inflow design flood control system plans specified
under Subsection R315-319-105(g)(4).
(5) Provide notification of the availability
of the periodic inspection reports specified under Subsection
R315-319-105(g)(6).
(6) Provide
notification of the availability of the documentation detailing the corrective
measures taken to remedy the deficiency or release specified under Subsection
R315-319-105(g)(7).
(7) Provide
notification of the availability of the periodic inspection reports specified
under Subsection R315-319-105(g)(9).
(h) Groundwater monitoring and corrective
action. The owner or operator of a CCR unit subject to Sections R315-319-50
through 107 shall notify the Director when information has been placed in the
operating record and on the owner or operator's publicly accessible Internet
site. The owner or operator shall:
(1) Provide
notification of the availability of the annual groundwater monitoring and
corrective action report specified under Subsection
R315-319-105(h)(1).
(2) Provide
notification of the availability of the groundwater monitoring system
certification specified under Subsection R315-319-105(h)(3).
(3) Provide notification of the availability
of the selection of a statistical method certification specified under
Subsection R315-319-105(h)(4).
(4)
Provide notification that an assessment monitoring programs has been
established specified under Subsection R315-319-105(h)(5).
(5) Provide notification that the CCR unit is
returning to a detection monitoring program specified under Subsection
R315-319-105(h)(7).
(6) Provide
notification that one or more constituents in appendix IV to Rule R315-319 have
been detected at statistically significant levels above the groundwater
protection standard and the notifications to land owners specified under
Subsection R315-319-105(h)(8).
(7)
Provide notification that an assessment of corrective measures has been
initiated specified under Subsection R315-319-105(h)(9).
(8) Provide notification of the availability
of assessment of corrective measures specified under Subsection
R315-319-105(h)(10).
(9) Provide
notification of the availability of the semiannual report describing the
progress in selecting and designing the remedy and the selection of remedy
report specified under Subsection R315-319-105(h)(12).
(10) Provide notification of the completion
of the remedy specified under Subsection R315-319-105(h)(13).
(i) Closure and post-closure care.
The owner or operator of a CCR unit subject to Sections R315-319-50 through 107
shall notify the Director when information has been placed in the operating
record and on the owner or operator's publicly accessible Internet site. The
owner or operator shall:
(1) Provide
notification of the intent to initiate closure of the CCR unit specified under
Subsection R315-319-105(i)(1).
(2)
Provide notification of the availability of the annual progress reports of
closure implementation specified under Subsection R315-319-105(i)(2).
(3) Provide notification of closure
completion specified under Subsection R315-319-105(i)(3).
(4) Provide notification of the availability
of the written closure plan, and any amendment of the plan, specified under
Subsection R315-319-105(i)(4).
(5)
Provide notification of the availability of the demonstration(s) for a time
extension for initiating closure specified under Subsection
R315-319-105(i)(5).
(6) Provide
notification of the availability of the demonstration(s) for a time extension
for completing closure specified under Subsection R315-319-105(i)(6).
(7) Provide notification of intent to close a
CCR unit specified under Subsection R315-319-105(i)(7).
(8) Provide notification of completion of
closure of a CCR unit specified under Subsection R315-319-105(i)(8).
(9) Provide notification of the deed notation
as required by Subsection R315-319-105(i)(9).
(10) Provide notification of intent to comply
with the alternative closure requirements specified under Subsection
R315-319-105(i)(10).
(11) The
annual progress reports under the alternative closure requirements as required
by Subsection R315-319-105(i)(11).
(12) Provide notification of the availability
of the written post-closure plan, and any amendment of the plan, specified
under Subsection R315-319-105(i)(12).
(13) Provide notification of completion of
post-closure care specified under Subsection R315-319-105(i)(13).
(j) Retrofit criteria. The owner
or operator of a CCR unit subject to Sections R315-319-50 through 107 shall
notify the Director when information has been placed in the operating record
and on the owner or operator's publicly accessible Internet site. The owner or
operator shall:
(1) Provide notification of
the availability of the written retrofit plan, and any amendment of the plan,
specified under Subsection R315-319-105(j)(1).
(2) Provide notification of intent to comply
with the alternative retrofit requirements specified under Subsection
R315-319-105(j)(2).
(3) The annual
progress reports under the alternative retrofit requirements as required by
Subsection R315-319-105(j)(3).
(4)
Provide notification of the availability of the demonstration(s) for a time
extension for completing retrofit activities specified under Subsection
R315-319-105(j)(4).
(5) Provide
notification of intent to initiate retrofit of a CCR unit specified under
Subsection R315-319-105(j)(5).
(6)
Provide notification of completion of retrofit activities specified under
Subsection R315-319-105(j)(6).