Utah Administrative Code
Topic - Environmental Quality
Title R315 - Waste Management and Radiation Control, Waste Management
Rule R315-261 - General Requirements - Identification and Listing of Hazardous Waste
Section R315-261-1060 - Air Emission Standards: Closed-Vent Systems and Control Devices

Universal Citation: UT Admin Code R 315-261-1060

Current through Bulletin 2024-06, March 15, 2024

(a) The remanufacturer or other person that stores or treats the hazardous secondary material in a hazardous secondary material management units using closed-vent systems and control devices subject to Sections R315-261-1050 through 1064 shall comply with the provisions of Section R315-261-1033.

(b)

(1) The remanufacturer or other person that stores or treats the hazardous secondary material at an existing facility who cannot install a closed-vent system and control device to comply with the provisions of Sections R315-261-1050 through 1064 on the effective date that the facility becomes subject to the provisions of Sections R315-261-1050 through 1064 shall prepare an implementation schedule that includes dates by which the closed-vent system and control device shall be installed and in operation. The controls shall be installed as soon as possible, but the implementation schedule may allow up to 30 months after the effective date that the facility becomes subject to Sections R315-261-1050 through 1064 for installation and startup.

(2) Any unit that begins operation after the effective date of rule R315-261 and is subject to the provisions of Sections R315-261-1050 through 1064 when operation begins, shall comply with the rules immediately, i.e., shall have control devices installed and operating on startup of the affected unit; the 30-month implementation schedule does not apply.

(3) The remanufacturer or other person that stores or treats the hazardous secondary material at any facility in existence on the effective date of a statutory or regulatory amendment that renders the facility subject to Sections R315-261-1050 through 1064 shall comply with all requirements of Sections R315-261-1050 through 1064 as soon as practicable but no later than 30 months after the amendment's effective date. When control equipment required by Sections R315-261-1050 through 1064 cannot be installed and begin operation by the effective date of the amendment, the facility owner or operator shall prepare an implementation schedule that includes the following information: Specific calendar dates for award of contracts or issuance of purchase orders for the control equipment, initiation of on-site installation of the control equipment, completion of the control equipment installation, and performance of any testing to demonstrate that the installed equipment meets the applicable standards of Sections R315-261-1050 through 1064. The remanufacturer or other person that stores or treats the hazardous secondary material shall keep a copy of the implementation schedule at the facility.

(4) Remanufacturers or other persons that store or treat the hazardous secondary materials at facilities and units that become newly subject to the requirements of Sections R315-261-1050 through 1064 after the effective date of Rule R315-261, due to an action other than those described in Subsection R315-261-1060(b)(3) shall comply with all applicable requirements immediately, i.e., shall have control devices installed and operating on the date the facility or unit becomes subject to Sections R315-261-1050 through 1064; the 30-month implementation schedule does not apply.

Disclaimer: These regulations may not be the most recent version. Utah may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.