Texas Administrative Code
Title 43 - TRANSPORTATION
Part 1 - TEXAS DEPARTMENT OF TRANSPORTATION
Chapter 21 - RIGHT OF WAY
Subchapter R - LEASING OF RIGHT OF WAY TO SALTWATER PIPELINE OPERATORS
Section 21.963 - Lease of Right of Way for a Saltwater Pipeline Facility

Universal Citation: 43 TX Admin Code § 21.963

Current through Reg. 50, No. 13; March 28, 2025

(a) The director may execute the lease of the premises for the installation, operation, and maintenance of a saltwater pipeline facility if the director finds that:

(1) there is sufficient area within the right of way to accommodate the saltwater pipeline facility;

(2) the area proposed as the premises will not be needed for highway purposes during the term of the lease; and

(3) the lessee's use of the right of way will be consistent with safety, maintenance, operation, and beautification of the state highway system.

(b) The lessee is required to pay to the department an amount determined by the department that is not less than fair market value for the lease of the premises. The department may consider its costs of administering the lease in establishing the amount charged.

(c) Except as provided by subsection (d) of this section, the term of the lease may not exceed 10 years, unless the lease contains a cancellation clause by which the department, in its sole discretion, may terminate the lease after 10 years with not more than 12 months' notice.

(d) The term of a lease for the installation of an above-ground saltwater pipeline facility may not exceed 180 days.

Disclaimer: These regulations may not be the most recent version. Texas may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.