(a) Unless otherwise directed by the commission, a remedial investigation as approved by the executive director shall be completed before the executive director's selection of the remedial action, except for removals and preliminary site investigations in accordance with § 335.346 of this title (relating to Removals and Preliminary Site Investigations).
(b) A similar study may be approved by the executive director as an appropriate alternative to the performance of a full remedial investigation when necessary to avoid delay, to make more effective use of resources or when such similar study is sufficient to adequately characterize a site.
(c) The contents of the remedial investigation as approved by the executive director, will depend on the particular circumstances of each specific facility. Under any remedial investigation, however, sufficient information must be collected and evaluated to allow the executive director to select an appropriate remedial action.
(d) A remedial investigation may include the following, as appropriate to a particular facility, for the purpose of allowing the executive director to select an appropriate remedial action:
(e) Protective concentration levels shall be developed in accordance with Chapter 350, Subchapter D of this title (relating to Development of Protective Concentration Levels).
(f) A workplan for a remedial investigation shall be submitted to the executive director for final review and possible modifications and shall include the following:
(g) Treatability studies may be required as necessary to provide information to evaluate remedial action alternatives.
(h) In evaluating the acceptability of a remedial investigation, the executive director may require the utilization of published agency and EPA technical guidance documents.
(i) A health and safety plan shall be prepared that addresses the protection of on-site personnel and the public from potential hazards associated with implementing the remedial investigation at a particular facility.
(j) A report shall be prepared at the completion of the remedial investigation and submitted to the executive director for review, possible modification, and final approval.
(k) The selection of the remedial alternative shall be made according to the process outlined in the guidance document "Presumptive Remedies for Soils at Texas State Superfund Sites" or other applicable presumptive remedy documents, unless the executive director determines that a feasibility study must be conducted.
(l) The remedial action for a particular facility shall be selected based on the remedial alternative that the executive director determines to be the lowest cost alternative which is technologically feasible and reliable, effectively mitigates and minimizes damage to the environment, and provides adequate protection of the public health and safety and the environment.
(m) All engineering evaluations, plans, and specifications included in the feasibility study or similar study must be prepared and submitted in accordance with the Texas Engineering Practice Act.
(n) All engineering and geoscientific information submitted to the agency shall be prepared by, or under the supervision of, a licensed professional engineer or licensed professional geoscientist, and shall be signed, sealed, and dated by qualified professionals as required by the Texas Engineering Practice Act and the Texas Geoscience Practice Act and the licensing and registration boards under these acts.