Texas Administrative Code
Title 30 - ENVIRONMENTAL QUALITY
Part 1 - TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Chapter 335 - INDUSTRIAL SOLID WASTE AND MUNICIPAL HAZARDOUS WASTE
Subchapter A - INDUSTRIAL SOLID WASTE AND MUNICIPAL HAZARDOUS WASTE IN GENERAL
Section 335.10 - Shipping and Reporting Procedures Applicable to Generators of Hazardous Waste or Class 1 Waste
Current through Reg. 50, No. 13; March 28, 2025
(a) Except as provided in paragraph (2) of this subsection, no person who generates, transports, processes, stores, or disposes of hazardous waste shall cause, suffer, allow, or permit the shipment of hazardous waste unless the person complies with this subsection, § 335.12 of this title (relating to Shipping Requirements Applicable to Owners or Operators of Treatment, Storage, or Disposal Facilities), § 335.13 of this title (relating to Recordkeeping and Reporting Procedures Applicable to Generators Shipping Hazardous Waste or Class 1 Waste), § 335.54 of this title (relating to Hazardous Waste Manifest), and § 335.58 of this title (relating to Transboundary Movements of Hazardous Waste for Recovery or Disposal).
(b) The manifesting and marking requirements of § 335.55 of this title (relating to Pre-Transport Requirements Applicable to Small and Large Quantity Generators) are not applicable to the transportation of hazardous waste on a public or private right-of-way within or along the border of contiguous property under the control of the same person, even if such contiguous property is divided by a public or private right-of-way. However, in the event of a hazardous waste discharge on a public or private right-of-way, the generator or transporter must comply with the requirements of § 335.93 of this title (relating to Hazardous Waste Discharges).
(c) Except as provided in subsections (d) and (e) of this section, persons who generate, transport, process, store, or dispose of Class 1 waste shall not cause, suffer, allow, or permit the shipment of Class 1 waste unless the person complies with the manifest requirements adopted in § 335.54 of this title with the following changes and additions:
(d) No manifest is required for the shipment of Class 1 waste generated by a person that generated less than 100 kilograms of Class 1 waste during the calendar month in which the subject Class 1 waste was generated.
(e) No manifest is required for the shipment of Class 1 waste to property owned or otherwise effectively controlled by the owner or operator of an industrial plant, manufacturing plant, mining operation, or agricultural operation from which the waste results or is produced, provided that: