Texas Administrative Code
Title 30 - ENVIRONMENTAL QUALITY
Part 1 - TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Chapter 331 - UNDERGROUND INJECTION CONTROL
Subchapter N - STANDARDS FOR CLASS I BEDDED SALT CAVERN DISPOSAL WELLS
Section 331.244 - Bedded Salt Cavern Construction Standards
Current through Reg. 50, No. 13; March 28, 2025
(a) Plans and specifications. Except as specifically required in the terms of the disposal well permit, construction of the cavern shall be done in accordance with all permit application plans and specifications. Any proposed changes to the plans and specifications must be certified in writing by the executive director that said changes provide protection standards equivalent to or greater than the original design criteria.
(b) Standards for bedded salt cavern construction.
(c) Injection tubing. Except for circulation of drilling fluids during well construction, all injection activities for bedded salt cavern construction and waste disposal in a bedded salt cavern shall be performed through removable injection tubing(s) installed inside the cemented long string casing and extending from the wellhead at ground surface to the bedded salt cavern below the long string casing seat.
(d) Logs and Tests.
(e) Workovers.
(f) Reports and approval.