Texas Administrative Code
Title 30 - ENVIRONMENTAL QUALITY
Part 1 - TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Chapter 329 - DRILLED OR MINED SHAFTS
Section 329.6 - Pre-application Activities
Current through Reg. 49, No. 52; December 27, 2024
(a) Persons who are determined to be proposing a new shaft subject to this chapter must obtain executive director approval of plans for the drilling of an engineering design test hole on center or offset to the shaft and a proposed seismic reflection survey (geophysical survey) for the purposes of site characterization, shaft and seal design, and shaft decommissioning prior to submitting an application for permit. Plans submitted for approval shall contain specific information which will address the following:
(b) An applicant may provide results of previous exploratory drilling and geophysical surveys to support its position that the engineering design test hole and seismic reflection survey (geophysical survey) are not necessary.
(c) After an appropriate review of the matters submitted under subsections (a) and (b) of this section, the executive director:
(d) Persons required to drill an engineering design test hole and/or conduct a seismic reflection survey must first obtain the written approval of the executive director.