Texas Administrative Code
Title 30 - ENVIRONMENTAL QUALITY
Part 1 - TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Chapter 328 - WASTE MINIMIZATION AND RECYCLING
Subchapter F - MANAGEMENT OF USED OR SCRAP TIRES
Section 328.71 - Closure Cost Estimate for Financial Assurance
Current through Reg. 50, No. 13; March 28, 2025
(a) As part of a facility's registration application, an owner or operator of a scrap tire storage site must prepare a written estimate, certified by a professional engineer, in current dollars, of the cost of hiring a third party to close the facility(ies). The closure cost for scrap tire storage sites is determined by the sum of paragraphs (1) and (2) of this subsection:
(b) The closure cost estimate must equal the cost of closing the facility based on the maximum number of whole tires stored at the facility, the maximum volume of tire pieces, and disabling any equipment as disclosed in the facility's registration application. The executive director shall evaluate and determine the amount for which evidence of financial assurance is required. The closure cost estimate provided by the owner or operator may be amended by the executive director. In some cases, the closure cost estimate may not be sufficient which means that the owner or operator remains responsible for the entire costs to close the site.
(c) Any amendment application shall include a recalculation of the closure cost estimate based on any requested volume increases. Facilities shall not increase the volume of whole tires or tire pieces generated from out of state and stored at the facility until the registration amendment has been approved by the executive director. Only upon approval of the executive director will the amended registration closure cost estimate be the basis for determining the amount of financial assurance required.
(d) The quantities of scrap tires reported on the registration application form and used in the calculation of financial assurance shall be obtained from the site layout plan volumes by using the following conversion factors:
(e) The calculated capacity of a site as calculated for closure may not be exceeded without the submission and approval of an amended registration application specifically including, but not limited to, new site layout plans to substantiate the revised capacity and new closure calculations based upon the depicted volumetric capacity converted to weights, posting of the revised financial assurance and written approval for the amended registration. The owner or operator is also responsible for submitting a registration amendment to revise the closure cost estimate whenever requested to do so by the executive director. Registration amendments with revised closure cost estimates shall be submitted to the executive director within 15 days of the executive director's written request to revise the closure cost estimate.
(f) The owner or operator must keep at the facility during the operating life of the facility a copy of the latest approved closure cost estimate and a copy of the current financial assurance mechanism.
(g) Financial assurance required under this section shall be provided in accordance with Chapter 37, Subchapter M of this title (relating to Financial Assurance Requirements for Scrap Tire Sites).
(h) Closure will begin when:
(i) Following a determination that the owner or operator has failed to perform closure in accordance with the registration requirements when required to do so or when closure begins under the circumstances outlined in subsection (h) of this section, the executive director may terminate or revoke the registration and draw on the financial assurance funds.