(j) Requirements for air standard permit authorization. AFOs shall meet the following requirements.
(1) Air emission limitations.
(A) Facilities shall be operated in such a manner as to prevent the creation of a nuisance as defined by Texas Health and Safety Code, §
341.011 and §
321.32(32) of this title (relating to Definitions), and as prohibited by §
101.4 of this title (relating to Nuisance). Facilities shall be operated in such a manner as to prevent a condition of air pollution as defined by Texas Health and Safety Code, §
382.003(3).
(B) The AFO operator shall take necessary action to identify any nuisance condition that occurs. The AFO operator shall take action to abate any nuisance condition as soon as practicable or as specified by the executive director.
(2) Buffer requirements. The buffer requirements in the following table apply to all of the requirements in subparagraphs (A) - (F) of this paragraph.
Attached
Graphic
(A) The determination of whether the applicable buffer requirements are satisfied shall be made on the basis of conditions existing at the earlier of:
(i) the date new construction, expansion, or modification of a facility begins; or
(ii) the date any application or notice of intent is first filed with the commission to obtain approval for the construction or operation of the facility.
(B) The operator of an AFO shall document that the applicable buffer requirement is satisfied in accordance with this paragraph. The operator of an AFO shall maintain such documentation on site and make it available upon request by any representative of the commission.
(C) The buffer distance shall be measured from the nearest edge of the permanent odor sources to the nearest edge of any occupied residence or business structure, school (including associated recreational areas), permanent structure containing a place of worship, or public park.
(D) Written consent, including a letter as defined by §
321.32(26) of this title, easement, or lease agreement specifically consenting to location and operation of permanent odor sources at an AFO within the required minimum buffer distance in this paragraph from the owner of the land containing each occupied residence or business structure, school (including associated recreational areas), permanent structure containing a place of worship, or public park located within the buffer distance may be obtained in lieu of satisfying the buffer distance requirements in this paragraph. Written consent from the governmental entity responsible for operating a school or public park, if the governmental entity is not the owner of the land containing the receptor, is required in addition to the consent of the owner of the land containing the receptor. An easement must be recorded with the county. The written consent must include the following information at the time the actions specified in this paragraph occur:
(i) the name, physical address, mailing address, and phone number of the owner(s) of the land containing the receptor and of the governmental entity responsible for the operation of the receptor, if applicable;
(ii) the types of animals and maximum number of animals to be confined under the AFO operator's current and/or anticipated authorization;
(iii) a description of the activity within the buffer distance for which the owner of the land containing the receptor and the governmental entity responsible for the operation of the receptor, if applicable, is giving consent;
(iv) the description and location of permanent odor sources located or proposed to be located within the buffer distance;
(v) an acknowledgment by the owner of the land containing the receptor located within the buffer distance, and by the governmental entity responsible for the operation of the receptor, if applicable, that the consent for the owner of the land containing the AFO to locate and operate permanent odor sources within the buffer distance excuses the operator of the AFO from otherwise applicable legal requirements; and
(vi) the verified signature of the owner(s) of the land containing the receptor, and of the governmental entity responsible for the operation of the receptor, if applicable, who is consenting to the location or operation of the AFO within the buffer distance.
(E) An area land use map as defined by §
321.32(5) of this title, an odor control plan, if required by this paragraph, and documentation and copies of the written consent required in subparagraph (D) of this paragraph shall be kept on site and made available upon request by the executive director.
(F) The odor control plan, if required by this paragraph, shall be developed and implemented to control and reduce odors, dust, and other air contaminants, as defined by §
321.32(2) of this title, from the AFO. The plan shall identify all structural and management practices that the operator will employ to minimize odor and control air contaminants at the AFO. At a minimum, the plan shall include, where applicable, procedures for manure/litter collection, manure, litter, and wastewater storage and treatment, land application, dead animal handling, and dust control. If the executive director determines that the implementation and employment of these practices is not effective in controlling dust, odors, and other air contaminants, the operator shall include any necessary additional abatement measures in the odor control plan and implement those measures to control and reduce these contaminants within the time period specified by the executive director.
(3) Wastewater treatment. Operators of AFOs that produce process-generated wastewater (excluding water trough overflow in open lots and wastewater from boiler operations) shall design and operate RCSs to minimize odors in accordance with accepted engineering practices. Each system shall be operated in accordance with the design and an operation and maintenance plan that minimizes odors.
(A) Accepted engineering practices to minimize odors include anaerobic treatment lagoons, aerobic treatment lagoons, or other equivalent technology. The retention control structures shall also meet the design criteria specified for water quality in this subchapter.
(B) Accepted design standards and requirements for each of these methods of treatment are:
(i) an anaerobic treatment lagoon shall be designed in accordance with American National Standards Institute/American Society of Agricultural Engineers EP403.3 July 1999 (or subsequent updates); Natural Resources Conservation Service (NRCS), Field Office Technical Guidance, Practice Standard 359, Waste Treatment Lagoon, or the equivalent for the control of odors. The primary lagoon in a multi-stage lagoon system shall be designed with a minimum treatment volume so that the lagoon maintains a constant level at all times unless prohibited by climatic conditions. A multi-stage lagoon system shall be designed to minimize the amount of contaminated storm water runoff entering the primary lagoon by routing the contaminated storm water runoff into a secondary RCS;
(ii) aerobic treatment lagoons shall be designed in accordance with NRCS, Field Office Technical Guidance, Practice Standard 359, Waste Treatment Lagoon; or technical requirements for sizing the aeration portion of the system located in Chapter 317 of this title (relating to Design Criteria for Sewerage Systems); and
(iii) equivalent technology or design standards shall indicate how the design of the AFO minimizes odors equivalent to an aerobic or anaerobic lagoon. These designs shall be developed and certified by a licensed Texas professional engineer. An "as-built" certification in letter form shall be completed by a licensed Texas professional engineer before operation of the AFO. These documents shall be maintained on site and made available within the time period specified by the executive director.
(4) Dust control. To minimize dust emissions, the AFO shall be operated and maintained as follows.
(A) Fugitive emissions from all grain receiving pits, where a pit is used, shall be minimized through the use of "choke feeding" or through an equivalent method of control. If choke feeding is used, operation of conveyors associated with receiving shall not commence until the receiving pits are full.
(B) As necessary, emissions from all in-plant roads, truck loading and unloading areas, parking areas, and other traffic areas shall be controlled with one or more of the following methods to minimize nuisance conditions and maintain compliance with all applicable commission requirements:
(i) sprinkled with water;
(ii) treated with effective dust suppressant(s); or
(iii) paved with a cohesive hard surface and cleaned.
(C) All non-vehicular external conveyors or other external conveying systems associated with the feedmill shall be enclosed.
(D) On-site feed milling operations with processing equipment using a pneumatic conveying system (which may include, but are not limited to, pellet mill/pellet cooler systems, flaker systems, grinders, and roller-mills) shall vent the exhaust air through a properly-sized high efficiency cyclone collector or an equivalent control device before releasing the exhaust air to the atmosphere. This requirement does not include cyclones used as product separators.
(E) If the executive director determines that the implementation and employment of these practices is not effective in controlling dust, the operator shall implement any necessary additional abatement measures to control and minimize this contaminant within the time period specified by the executive director.
(5) Maintenance and housekeeping. The AFO operator shall comply with the following to help prevent nuisance conditions.
(A) The premises shall be maintained to prevent the occurrence of nuisance conditions from odors and dust. Spillage of any raw products or waste products causing a nuisance condition shall be picked up and properly disposed of daily.
(B) Proper pen drainage shall be maintained at all times. Earthen pen areas shall be maintained by scraping uncompacted manure and shaping pen surfaces as necessary to minimize odors and ponding.