Texas Administrative Code
Title 30 - ENVIRONMENTAL QUALITY
Part 1 - TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Chapter 218 - BRINE EVAPORATION PITS
Section 218.25 - Closure and Post Closure Care
Current through Reg. 49, No. 52; December 27, 2024
(a) At closure, the owner or operator must:
(b) If some waste residues or contaminated materials are left in place at final closure, the owner or operator must comply with the following post-closure requirements:
(c) Additional post closure requirements may be added by the executive director as determined to be necessary to protect human health and/or the environment; including but not limited to, groundwater monitoring.
(d) The closure plan for the brine evaporation pit must include both a plan for complying with subsection (a)(1) of this section and a contingent plan for complying with subsection (a)(2) of this section, in case not all contaminated subsoils can be practicably removed at closure; and the owner or operator must prepare a contingent post-closure plan for complying with subsection (b) of this section, in case not all contaminated subsoils can be practicably removed at closure.
(e) Written notification must be provided to the executive director at least 90 days prior to conducting any facility closure activity.
(f) Within ten days after completion of final closure activities of a facility, the owner or operator shall submit to the executive director by registered mail the following: