Texas Administrative Code
Title 30 - ENVIRONMENTAL QUALITY
Part 1 - TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Chapter 117 - CONTROL OF AIR POLLUTION FROM NITROGEN COMPOUNDS
Subchapter C - COMBUSTION CONTROL AT MAJOR UTILITY ELECTRIC GENERATION SOURCES IN OZONE NONATTAINMENT AREAS
Division 1 - BEAUMONT-PORT ARTHUR OZONE NONATTAINMENT AREA UTILITY ELECTRIC GENERATION SOURCES
Section 117.1035 - Initial Demonstration of Compliance
Current through Reg. 50, No. 13; March 28, 2025
(a) The owner or operator of all units that are subject to the emission specifications of this division (relating to Beaumont-Port Arthur Ozone Nonattainment Area Utility Electric Generation Sources) shall test the units as follows.
(b) The tests required by subsection (a) of this section must be used for determination of initial compliance with the emission specifications of this division. Test results must be reported in the units of the applicable emission specifications and averaging periods. If compliance testing is based on 40 Code of Federal Regulations Part 60, Appendix A reference methods, the report must contain the information specified in § 117.8010 of this title (relating to Compliance Stack Test Reports).
(c) Continuous emissions monitoring systems (CEMS) or predictive emissions monitoring systems (PEMS) required by § 117.1040 of this title (relating to Continuous Demonstration of Compliance) must be installed and operational before testing under subsection (a) of this section. Verification of operational status must, at a minimum, include completion of the initial monitor certification and the manufacturer's written requirements or recommendations for installation, operation, and calibration of the device.
(d) Initial compliance with the emission specifications of this division for units operating with CEMS or PEMS in accordance with § 117.1040 of this title must be demonstrated after monitor certification testing using the NOX CEMS or PEMS as follows.