(a) Blowdown water from power boilers must pass through an approved blowdown separator or blowdown tank when entering a sanitary sewer.
(b) The temperature of the blowdown water leaving the blowdown separator or blowdown tank must not exceed 140 degrees Fahrenheit.
(c) The pressure of the blowdown water leaving a blowdown separator or blowdown tank must not exceed 5 PSIG.
(d) All blowdown piping and fittings must meet requirements set forth in ASME Piping Code B31.1, Power Piping.
(e) A blowdown separator must be fitted with threaded or flanged openings to facilitate inspection. A blowdown tank must be fitted with a manway for cleaning and inspection.
(f) The vent and drain of the blowdown separator or blowdown tank must be piped to a safe point of discharge.
(g) A blowdown separator or blowdown tank, when required by this chapter, must:
(h) Installation or modification of equipment to achieve compliance with this section is required to be completed no later than June 1, 2025.