Texas Administrative Code
Title 16 - ECONOMIC REGULATION
Part 1 - RAILROAD COMMISSION OF TEXAS
Chapter 3 - OIL AND GAS DIVISION
Section 3.12 - Directional Survey Company Report
Current through Reg. 49, No. 12; March 22, 2024
(a) For each well drilled for oil, gas, or geothermal resources for which a directional survey report is required by rule, regulation, or order, the surveying company shall prepare and file the following information. The information shall be certified by the person having personal knowledge of the facts, by execution and dating of the data compiled:
(b) Each directional survey, with its accompanying certification and a certified plat on which the bottom hole location is oriented both to the surface location and to the lease lines (or unit lines in case of pooling) shall be mailed by registered, certified, or overnight mail direct to the commission in Austin by the surveying company making the survey. The surveying company may file electronically if the Commission has provided for such filing.