Section 12.507 - Topsoil: Redistribution
Universal Citation: 16 TX Admin Code § 12.507
Current through Reg. 50, No. 13; March 28, 2025
(a) After final grading and before the replacement of topsoil and other materials segregated in accordance with § 12.505 of this title (relating to Topsoil: Removal), regraded land shall be scarified or otherwise treated as required by the Commission to eliminate slippage surfaces and to promote root penetration. If the person who conducts underground mining activities shows, through appropriate tests, and the Commission approves, that no harm will be caused to the topsoil and vegetation, scarification may be conducted after topsoiling.
(b) Topsoil and other materials shall be redistributed in a manner that:
(1) achieves an approximate uniform, stable
thickness consistent with the postmining land uses, slopes, and
surface-drainage system;
(2)
prevents excess compaction of the topsoil; and
(3) protects the topsoil from wind and water
erosion before and after it is seeded and planted.
Disclaimer: These regulations may not be the most recent version. Texas may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.