Section 12.197 - Operation Plan: Maps and Plans

Universal Citation: 16 TX Admin Code § 12.197

Current through Reg. 50, No. 13; March 28, 2025

Each application shall contain maps, plans, and cross sections of the proposed permit and adjacent areas as follows:

(1) the maps, plans and cross sections shall show the underground mining activities to be conducted, the lands to be affected throughout the operation, and any change in a facility or feature to be caused by the proposed operations, if the facility or feature was shown under § 12.182 and § 12.183 of this title (relating to Maps: General Requirements, and to Cross Sections, Maps, and Plans);

(2) the following shall be shown for the proposed permit area unless specifically required for the permit and adjacent area by the requirements of this section:

(A) buildings, utility corridors, and facilities to be used;

(B) the area of land to be affected within the proposed permit area, according to the sequence of mining and reclamation;

(C) each area of land for which a performance bond or other equivalent guarantee will be posted under Subchapter J of this chapter (relating to Bond and Insurance Requirements for Surface Coal Mining and Reclamation Operations);

(D) each coal storage, cleaning and loading area;

(E) each topsoil, spoil, coal preparation waste, underground development waste, and noncoal waste storage area;

(F) each water diversion, collection, conveyance, treatment, storage and discharge facility to be used;

(G) each source of waste and each waste-disposal facility relating to coal processing or pollution control;

(H) each facility to be used to protect and enhance fish and wildlife related environmental values;

(I) each explosive storage and handling facility;

(J) location of each sedimentation pond, permanent water impoundment, coal mine waste bank, and coal mine waste dam and embankment, in accordance with § 12.190 of this title (relating to Reclamation Plan: Ponds, Impoundments, Banks, Dams, and Embankments) and disposal areas for underground development waste and excess spoil in accordance with § 12.193 of this title (relating to Underground Development Waste/Return of Coal Processing Waste to Underground Workings);

(K) each profile, at cross sections specified by the Commission of the anticipated final surface configuration to be achieved for the affected areas;

(L) location of each water and subsidence monitoring point; and

(M) location of each facility that will remain on the proposed permit area as a permanent feature, after the completion of underground mining activities.

(3) except as provided in §§12.190(a)(2) and (3), 12.193(a), 12.531(b), 12.534(b)(1), and 12.535(c) of this title (relating to Reclamation Plan: Ponds, Impoundments, Banks, Dams, and Embankments, to Underground Development Waste/Return of Coal Processing Waste to Underground Workings, to Disposal of Underground Development Waste and Excess Spoil: General Requirements, to Disposal of Underground Development Waste and Excess Spoil: Durable Rock Fills, and to Coal Mine Waste Banks: General Requirements), maps, plans, and cross-sections required under paragraph (2)(D)-(F), (J), and (K) of this subsection shall be prepared by, or under the direction of, and certified by a qualified professional engineer, or qualified professional geoscientist, with assistance from experts in related fields such as land surveying and landscape architecture; and

(4) a description of and plans and drawings for each support facility to be constructed, used, or maintained within the proposed permit area. The plans and drawings shall include a map, appropriate cross sections, design drawings, and specifications sufficient to demonstrate compliance with § 12.572 of this title (relating to Support Facilities) for each facility.

Disclaimer: These regulations may not be the most recent version. Texas may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.