Texas Administrative Code
Title 16 - ECONOMIC REGULATION
Part 1 - RAILROAD COMMISSION OF TEXAS
Chapter 12 - COAL MINING REGULATIONS
Subchapter G - SURFACE COAL MINING AND RECLAMATION OPERATIONS, PERMITS, AND COAL EXPLORATION PROCEDURES SYSTEMS
Division 9 - UNDERGROUND MINING PERMIT APPLICATIONS - MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN
Section 12.194 - Subsidence Control Plan
Current through Reg. 50, No. 13; March 28, 2025
The application shall include a survey which shall show whether structures or renewable resource lands exist within the proposed permit and adjacent area and whether subsidence if it occurred could cause material damage or diminution of reasonably foreseeable use of such structures or renewable resource lands. If the survey shows that no such structures or renewable resource lands exist, or no such material damage or diminution could be caused in the event of mine subsidence, and if the Commission agrees with such conclusion, no further information need be provided in the application under this section. In the event the survey shows such structures or renewable resource lands exist and that subsidence could cause material damage or diminution of value or foreseeable use of the land, or if the Commission determines that such damage or diminution could occur, the application shall include a subsidence plan which shall contain the following information:
(1) a detailed description of the mining method and other measures to be taken which may affect subsidence, including:
(2) a detailed description of the measures to be taken to prevent subsidence from causing material damage or lessening the value or reasonably foreseeable use of the surface, including:
(3) a detailed description of the measures to be taken to mitigate the effects of any material damage or diminution of value or foreseeable use of lands which may occur, including one or more of the following as required by § 12.564 of this title (relating to Subsidence Control: Surface-Owner Protection):
(4) a detailed description of measures to be taken to determine the degree of material damage or diminution of value or foreseeable use of the surface, including such measures as:
(5) a map of underground workings which describes the location and extent of areas in which planned-subsidence mining methods will be used and which includes all areas where the measures described in paragraph (2) of this section will be taken to prevent or minimize subsidence and subsidence-related damage; and
(6) other information specified by the Commission as necessary to demonstrate that the operation will be conducted in accordance with the performance standards of §§ 12.562-12.565 of this title (relating to Subsidence Control: General Requirements, to Subsidence Control: Public Notice, to Subsidence Control: Surface-Owner Protection, and to Subsidence Control: Buffer Zones).