Rules & Regulations of the State of Tennessee
Title 0780 - Commerce and Insurance
Subtitle 0780-02 - Division of Fire Prevention
Chapter 0780-02-13 - Modular Building Units
Section 0780-02-13-.07 - RESPONSIBILITIES OF APPROVED CONSTRUCTION INSPECTION AGENCIES

Current through September 24, 2024

(1) Each approved construction inspection agency shall discharge the following responsibilities:

(a) Monitoring the compliance assurance program of each manufacturer which such agency serves;

(b) Verifying that modular building units and components have been manufactured pursuant to approved building system documentation and an approved compliance assurance program;

(c) Authorizing the attachment of labels to such modular building units and components; and

(d) Preparing all reports which the Department may reasonably require in carrying out its responsibilities under this Chapter, including monthly inspection reports and monthly production reports (Form A). These reports may be required to be submitted electronically.

(2) Initial Plant Certification Inspection

(a) No label shall be affixed to any modular building unit or component until the approved construction inspection agency has completed an initial plant certification inspection of the manufacturer's facility. The initial plant certification inspection for manufacturers located outside the State of Tennessee must be performed on the first unit designated for placement in the State of Tennessee. The initial plant certification inspection for manufacturers located inside the State of Tennessee must be performed on the first unit placed into production.

(b) The initial plant certification inspection shall consist of a complete evaluation of the manufacturer's adherence to its compliance assurance program and capability of producing a unit, including any component(s), in accordance with the approved building system.

(c) The approved construction inspection agency shall become familiar with every aspect of the manufacturer's approved building system and compliance assurance program.

(d) The approved construction inspection agency shall make a complete inspection of the manufacture of at least one modular building unit and any component(s) pertaining to that particular unit throughout all of the operation in the facility. If the first unit inspected or any component(s) pertaining to that particular unit fails to conform to the standards, additional units and component(s) shall be similarly inspected until the agency is satisfied that the manufacturer is complying with the approved building system and the standards.

(3) Plant Certification Report. If, on the basis of the initial plant certification inspection, the approved construction inspection agency determines that the manufacturer is in compliance with its approved building system, compliance assurance program, and the standards, the agency shall prepare and forward to the Department a certification report within thirty (30) days of the completion of the initial plant certification inspection. The certification report shall include:

(a) The name and address of the manufacturing facility;

(b) The name of the approved design review agency which approved the manufacturer's building system and compliance assurance program, and the dates of approval;

(c) The names and titles of the inspection agency personnel performing the initial plant certification inspection;

(d) The serial numbers of the modular building units or components inspected;

(e) A full report of all inspections conducted, nonconformities observed and corrective actions taken;

(f) The date of certification; and

(g) The label number(s) assigned to the unit.

(4) Frequency of Inspections

(a) After initial plant certification, the approved construction inspection agency shall inspect:
1. Each modular building unit or component in at least one stage of construction; and

2. Every stage of construction during the course of each inspection visit to a manufacturing facility.

(b) The Department may waive compliance with a compliance assurance program at the request of the manufacturer. Upon the grant of such waiver, the manufacturer shall have each modular building unit or component which it produces completely inspected by an approved construction inspection agency.

(c) The approved construction inspection agency shall conduct unannounced inspections at the manufacturing site to review any aspects of the manufacturing process.

(d) Nothing in this paragraph shall preclude an approved construction inspection agency from conducting inspections at a greater frequency than the minimum prescribed herein if, in the agency's or Department's professional judgment, such action is necessary to discharge its responsibilities properly. In determining the appropriate frequency of inspection for any manufacturer, an approved construction inspection agency should consider such factors as:
1. The production volume of the factory;

2. The complexity of the design;

3. The qualifications of the manufacturer's quality control personnel;

4. The experience record of the manufacturer; and

5. The failure to follow compliance assurance procedures.

Authority: T.C.A. §§ 68-36-302 through 68-36-305, 68-102-113, 68-126-302, and 68-126-305.

Disclaimer: These regulations may not be the most recent version. Tennessee may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.