Rules & Regulations of the State of Tennessee
Title 0400 - Environment and Conservation
Subtitle 0400-52 - Drilling, Re-Entering, Plugging and Abandoning Exploratory and Exploitation Oil and Gas Wells (Transferred from 1040-02)
Chapter 0400-52-07 - Casing Program (Transferred from 1040-02-07)
Section 0400-52-07-.02 - CONDUCTOR PIPE

Current through December 26, 2024

Conductor pipe or conductor casing shall be used for the purpose of supporting unconsolidated surface deposits. The use and removal of less than 40 feet of conductor pipe during the drilling of any oil or gas well shall be at the option of the operator. If such conductor pipe is to be pulled it shall be pulled prior to the cementing of the surface casing. All conductor casing shall have a cement seal at the surface preventing the possibility of any groundwater contamination and shall remain in the well if not pulled prior to the surface casing cement job. If more than 40 feet of conductor pipe was installed, the conductor pipe may not be pulled.

Authority: T.C.A §§ 60-1-201 et seq., and 4-5-201 et seq.

Disclaimer: These regulations may not be the most recent version. Tennessee may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.