Rules & Regulations of the State of Tennessee
Title 0400 - Environment and Conservation
Subtitle 0400-45 - Division of Water Resources
Chapter 0400-45-07 - Rules and Regulations Applied to the Safe Dams Act of 1973 (Transferred from 1200-05-07)
Section 0400-45-07-.08 - ENGINEERING REQUIREMENTS

Current through September 24, 2024

(1) Engineering Standards. The design engineer shall take into consideration the standards and recommendations made in accepted publications concerning dams, and also the current practices of the various agencies that may be concerned with the design and construction of dams.

(2) Engineering Drawings. All drawings shall be submitted in the form of permanent type drawings of a standard and uniform size. Drawings that do not conform to standard practices and drawings that are not easily legible will not be reviewed.

(3) Engineering Plans. At least four (4) complete sets of construction plans and specifications shall be submitted to the Commissioner. Upon approval, each submitted copy shall be stamped accordingly, two copies retained for the Division's file, and the remaining copies returned to the applicant. An approved copy bearing the stamp of approval must be kept at the construction site during all times of construction.

(4) Engineering Report. The engineering report shall be submitted for review prior to or along with the submittal of the plans and specifications. The engineering report is the basis of the design and shall include, but not be limited to, the data and analyses required by Rule 0400-45-07-.07 for new dam construction or by Rule 0400-45-07-.06 for alterations to existing dams.

(5) Plans and Specifications. The plans and specifications shall provide the details of the structure designed in the engineering report, the construction materials, the construction methods, and shall include, but not be limited to, the following:

(a) Standard and uniform paper. Preferably 24" x 36".

(b) Cover sheet.

(c) Site plan.

(d) Embankment plan and profile views.

(e) Spillways plan and profile views.

(f) Seepage control detail including collection system.

(g) Wave protection detail.

(h) Service spillway outfall structure and energy dissipator details.

(i) Location of permanent bench mark.

(j) Location sketch.

(k) Actual mean sea level (MSL) elevations of the dam and its appurtenant works.

Authority: T.C.A. §§ 69-11-101 et seq., and 4-5-201 et seq.

Disclaimer: These regulations may not be the most recent version. Tennessee may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.