Rules & Regulations of the State of Tennessee
Title 0400 - Environment and Conservation
Subtitle 0400-42 - Water Resources (Surface Mining)
Chapter 0400-42-12 - Barite (Transferred from 0400-03-12 which was repealed)
Section 0400-42-12-.03 - OPERATION, BACKFILLING AND GRADING

Current through September 24, 2024

(1) Site Preparation and Mining.

(a) Prior to, opening a site heretofore undisturbed by mining, all possible preparation measures shall be taken so as to minimize the acreage disturbed to facilitate reclamation at the conclusion of mining.

(b) Mining and handling of spoil shall be planned in advance and conducted so as to minimize offsite effects during mining and to achieve quick and permanent reclamation on each part of the site as soon as mining on that part is concluded.

(2) Regrading.

At the conclusion of mining, the surfaces shall be graded to approximately the original contour, unless quantities of the mineral produced have altered significantly the contour of the disturbed areas, in such situations, the site shall be regraded to rolling topography which will blend in naturally with the surrounding terrain. No water-collecting depressions shall be left unless approved impoundments are to be constructed.

(3) Water Impoundments.

The operator may elect to impound water to provide lakes or ponds for wildlife, recreation, or water supply purposes, provided such impoundments will not create conditions that will contribute to soil erosion or stream pollution, or jeopardize the health, safety, or property of adjacent landowners. Impoundments must be included in the mine and reclamation plan and details concerning the size and location and the construction plans of dams, embankments, and spillways must be included. The proposed impoundment must meet safety requirements of appropriate State agencies and must be approved by the Department if the surface area exceeds one acre.

(4) Water Control.

Because pits generally are small and are active intermittently as there is a demand for the product, the operator shall incorporate into the mining program appropriate measures of control erosion and offsite damage from silt by construction of log or rock silt traps. Other measures shall be required as appropriate to abate the problems associated with temporarily inactive sites.

(5) Alternation Reclamation.

The Division is aware of circumstances which might cause termination of mining with substantial quantities of the mineral remaining for probable future production, so the operator is encouraged to reclaim mined areas at the site which are not necessarily due to his operations. Such alternate reclamation must have the approval of the Commissioner in advance, and must be where all the mineral has been exhausted with the likelihood of disturbance by future mining extremely remote.

Authority: T.C.A. §§ 59-8-201 et seq. and 4-5-201 et seq.

Disclaimer: These regulations may not be the most recent version. Tennessee may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.