South Dakota Administrative Rules
Title 74 - Department of Environment And Natural Resources
Article 74:29 - Mined land reclamation
Chapter 74:29:11 - In situ leach mining
- Section 74:29:11:01 - Application for in situ leach mine permit - Contents
- Section 74:29:11:01.01 - Underground injection control - Class III Well permit required for mine permit
- Section 74:29:11:02 - Application content requirements - Additional baseline information required
- Section 74:29:11:03 - Application content requirements - Mine operations plan
- Section 74:29:11:04 - Application content requirements - Reclamation plan
- Section 74:29:11:05 - Determination of ground water restoration demonstration
- Section 74:29:11:06 - Ground water restoration table
- Section 74:29:11:07 - Establishment of baseline water quality in new mining areas
- Section 74:29:11:08 - Technical revisions to an in situ leach mine permit
- Section 74:29:11:09 - Designation of exempted aquifers
- Section 74:29:11:10 - Injection wells subject to the provisions of this chapter
- Section 74:29:11:11 - Well location and protection
- Section 74:29:11:12 - Well construction requirements
- Section 74:29:11:13 - Well construction requirements - Injection wells
- Section 74:29:11:14 - Minimum requirements for monitor wells
- Section 74:29:11:15 - Disposal of drill cuttings
- Section 74:29:11:16 - Mechanical integrity testing of injection wells
- Section 74:29:11:17 - Supervision of well construction and testing
- Section 74:29:11:18 - Requirements for plugging drill holes and repair, conversion, and plugging wells
- Section 74:29:11:19 - Corrective actions for improperly sealed wells
- Section 74:29:11:20 - Authorizing new injection wells within permit area boundary
- Section 74:29:11:21 - Design and construction of in situ leach mine surface facilities
- Section 74:29:11:22 - Construction quality assurance plan
- Section 74:29:11:23 - Pond and surface impoundment design and construction requirements
- Section 74:29:11:24 - Pipeline design and construction requirements
- Section 74:29:11:25 - Recovery plant and satellite facility design and construction requirements
- Section 74:29:11:26 - Uranium byproduct material handling and disposal systems
- Section 74:29:11:27 - Disposal of liquid waste
- Section 74:29:11:28 - Disposal of nonradioactive solid waste
- Section 74:29:11:29 - Prohibitions - Injection volumes and pressure
- Section 74:29:11:30 - Production area operational monitoring requirements
- Section 74:29:11:31 - Production area monitor well location and spacing requirements
- Section 74:29:11:32 - Nonproduction zone monitoring
- Section 74:29:11:33 - Subsidence monitoring
- Section 74:29:11:34 - Confinement of recovery fluid
- Section 74:29:11:35 - Reporting excursions
- Section 74:29:11:36 - Verifying analysis
- Section 74:29:11:37 - Excursion sampling frequency
- Section 74:29:11:38 - Remedial action for excursion
- Section 74:29:11:39 - Excursions - Controlled
- Section 74:29:11:40 - Excursions - Not controlled
- Section 74:29:11:41 - Criteria for determination of adequacy of remedial action plan
- Section 74:29:11:42 - Reporting requirements
- Section 74:29:11:43 - Well construction records
- Section 74:29:11:44 - Well plugging records
- Section 74:29:11:45 - Maintenance and retention of records
- Section 74:29:11:46 - Ground water restoration requirements
- Section 74:29:11:47 - Restoration sampling procedure
- Section 74:29:11:48 - Restoration progress reports
- Section 74:29:11:49 - Final restoration - Restoration values achieved
- Section 74:29:11:50 - Restoration values not achieved
- Section 74:29:11:51 - Closure of mine site following restoration
- Section 74:29:11:52 - Reclamation of in situ leach mine surface facilities
- Section 74:29:11:53 - Radiation survey of surface facilities at mine closure
- Section 74:29:11:54 - Radiation standards for closure of surface facilities
- Section 74:29:11:55 - Postclosure plan - Estimated costs for postclosure care
- Section 74:29:11:56 - General postclosure inspection and maintenance activities
- Section 74:29:11:57 - Postclosure operation of monitoring systems
- Section 74:29:11:58 - Ground water contamination during the postclosure period
- Section 74:29:11:59 - End of the postclosure period
- Section 74:29:11:60 - Public notice for in situ leach mines
Disclaimer: These regulations may not be the most recent version. South Dakota may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.