Before the owner of any aircraft uses, or propose to use, any area of land or water for temporary operations to, in any nature, transport or load and unload passengers whatsoever, the owner shall apply to the Aeronautics Commission for a temporary field permit upon forms provided for that purpose by the Aeronautics Commission. The application must be received by the commission at least 15 days before the date the applicant wished to use the area. The area shall then be inspected by the commission and if found to be of a size and nature that is safe for use by the type of aircraft specified in the application to be used in the operations and to have clear and unobstructed approaches to the temporary landing area, the commission may issue a temporary field permit, not to exceed 60 days. However, if the Aeronautics Commission at any time determines that the temporary field permit privilege is being abused by one or a group of owners of aircraft, it shall refuse the granting of temporary field permits in the interest of the health, welfare, and safety of the public.

General Authority: SDCL 50-2-2.1.

Law Implemented: SDCL 50-2-2.1.

Disclaimer: These regulations may not be the most recent version. South Dakota may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.