South Dakota Administrative Rules
Title 20 - PUBLIC SAFETY
Article 20:10 - PUBLIC UTILITIES COMMISSION
Chapter 20:10:36 - Small generator facility interconnection
Section 20:10:36:44 - Tier 3 interconnection alternate evaluation and screening criteria
Current through Register Vol. 50, page 114, March 25, 2024
For a small generator facility to interconnect to a distribution circuit that is not networked, the following criteria shall be met for a tier 3 interconnection:
(1) The small generator facility has an electric nameplate capacity of 10 megawatts or less;
(2) The aggregated total of the electric nameplate capacity of all of the generators on the circuit, including existing FERC wholesale generators, FERC wholesale generators with a higher queue position, and the proposed small generator facility, is 10 megawatts or less;
(3) The small generator facility does not export power beyond the point of interconnection and employs reverse power relays or other protection functions that prevent power flow onto the EDS;
(4) The small generator facility's proposed interconnection is to a radial distribution circuit;
(5) The small generator facility is not served by a shared transformer;
(6) The interconnection will use only existing public utility facilities and the applicant's proposed facilities; and
(7) If the public utility's distribution circuit utilizes high speed reclosing with less than 2 seconds of interruption, the proposed generator may not be a synchronous machine.
General Authority: SDCL 49-34A-27, 49-34A-93.
Law Implemented: SDCL 49-34A-27, 49-34A-93.