South Carolina Code of Regulations
Chapter 71 - DEPARTMENT OF LABOR, LICENSING AND REGULATION-DIVISION OF LABOR
Article 8 - OFFICE OF STATE FIRE MARSHAL
Subarticle 1 - FIRE PREVENTION AND LIFE SAFETY
Section 71-8300.4 - Submittals for Plan Review
Universal Citation: SC Code Regs 71-8300.4
Current through Register Vol. 48, No. 9, September 27, 2024
A. Construction documents and/or shop drawings, as appropriate, must be submitted to the OSFM for the following:
1. Fire
sprinkler systems per S.C. Code Ann. Section
40-10-260.
2. LP-Gas systems per R.71-8304.
3. Hydrogen facilities per S.C. Code Ann.
Section 23-9-510 et seq.
4. Facilities that the OSFM is contractually
obligated to review.
B. Construction documents, shop drawings, and supporting documentation for plan review shall be in accordance with this section.
1. Documents and supporting data shall be
submitted in one complete set with each application for a review and in such
form and detail as required by the OSFM reviewer to be able to determine
compliance.
2. The construction
documents and shop drawings shall be prepared by the appropriate registered
design professional(s) or other LLR licensee as required by statute or
regulation.
3. The OSFM is
authorized to not require the submission of construction documents and
supporting data if:
a. they are not required
to be prepared by a registered design professional, and
b. it is found that the nature of the work
applied for is such that review of construction documents is not necessary to
obtain compliance with this code.
4. OSFM shall examine or cause to be examined
the submitted construction documents and shall ascertain by such examinations
whether the work indicated and described is in accordance with the applicable
requirements.
5. Drawings shall be
drawn to scale. Documents submitted for review shall be in electronic media
.DWF or .PDF format. Non-electronic media documents are allowed to be submitted
when approved by the OSFM. Documents shall be of sufficient clarity to indicate
the location, nature and extent of the work proposed and show in detail that it
will conform to the provisions of these regulations and other relevant laws,
rules and regulations as determined by the OSFM.
a. Drawings and other documents reviewed by
OSFM shall be submitted to indicate compliance with applicable statutes, these
regulations and the referenced codes and standards, and shall be approved prior
to the start of installation. If the permitting authority authorizes the
installation prior to the written approval of OSFM, it is automatically
considered a revocation of the AHJ's request for OSFM review. Shop drawings
shall contain all information as required by the applicable statutes,
regulations, adopted codes and referenced installation standards.
b. Information on construction documents and
shop drawings shall be specific, and the technical codes shall not be cited in
whole or in part, nor shall the term "legal" or its equivalent to be used as a
substitute for specific information.
c. All drawings shall bear a title block with
complete, legible information indicating at a minimum where applicable: project
name, project address, drawing author, drawing title, drawing number, original
drawing date, all subsequent drawing revision dates, sequential drawing
revision numbers, company name, and company mailing
address.
6. It shall be
the responsibility of the applicant to ensure that the submitted documents
include all of the fire protection requirements and the shop drawings are
complete and in compliance with the applicable statutes, regulations, codes and
standards.
7. Submitted documents
approved by the OSFM are approved with the intent that such construction
documents comply in all respects with this code. Review and approval by the
OSFM shall not relieve the applicant of the responsibility of compliance with
this code.
a. The OSFM is authorized to issue
approval for the construction of part of a structure, system or operation
before the construction documents for the whole structure, system or operation
have been submitted, provided that adequate information and detailed statements
have been filed complying with pertinent requirements of this code. The holder
of such approval for parts of a structure, system or operation shall proceed at
the holder's own risk with the building operation and without assurance that
approval for the entire structure, system or operation will be
granted.
b. The issuance or
granting of an approval shall not be construed to be an approval of any
violation of any of the provisions of these regulations. Approvals presuming to
give authority to violate or cancel the provisions of these regulations shall
not be valid. The issuance of approval based on construction documents and
other data shall not prevent an AHJ from requiring the correction of errors in
the construction documents and other data. Any addition to or alteration of
approved construction documents shall be approved in advance by the AHJ, as
evidenced by the issuance of a new or amended approval.
8. Where field conditions necessitate any
substantial change from the approved construction documents, the AHJ shall have
the authority to require the corrected construction documents to be submitted
for approval.
9. The OSFM is
authorized to revoke approval issued under the provisions of these regulations
when it is found by inspection or otherwise that there has been a false
statement or misrepresentation as to the material facts in the application or
construction documents, drawings, or other submitted documentation on which the
permit or approval was based including, but not limited to, any one of the
following:
a. The permit or approval is used
for a location or establishment other than that for which it was
issued.
b. The permit or approval
is used for a condition or activity other than that listed in the
permit.
c. Conditions and
limitations set forth in the permit or approval have been violated.
d. There have been any false statements or
misrepresentations as to the material fact in the application for permit or
submitted plans and other documents, or a condition of the permit.
e. The permit or approval is used by a
different person or firm than the name for which it was issued.
f. Failure, refusal, or neglect to comply
with orders or notices duly served in accordance with the provisions of this
regulation within the time provided therein.
g. The permit or approval was issued in error
or in violation of a statute, regulation, code, or
standard.
Disclaimer: These regulations may not be the most recent version. South Carolina may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.