South Carolina Code of Regulations
Chapter 61 - DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
Subchapter 61-92 - UNDERGROUND STORAGE TANK CONTROL REGULATIONS
Part 280 - TECHNICAL STANDARDS AND CORRECTIVE ACTION REQUIREMENTS FOR OWNERS AND OPERATORS OF UNDERGROUND STORAGE TANKS (UST)
Subpart C - GENERAL OPERATING REQUIREMENTS
Section 61-92.280.C.36 - PERIODIC OPERATION AND MAINTENANCE WALKTHROUGH INSPECTIONS
Current through Register Vol. 48, No. 9, September 27, 2024
(a) To properly operate and maintain UST systems, not later than May 26, 2020 owners and operators must meet one of the following:
[Note to paragraph (a)(2). The following code of practice may be used to comply with paragraph (a)(2) of this section: Petroleum Equipment Institute Recommended Practice RP 900, ''Recommended Practices for the Inspection and Maintenance of UST Systems."]
(b) Owners and operators must maintain records (in accordance with Section 280.34) of operation and maintenance walkthrough inspections for one year. Records must include a list of each area checked, whether each area checked was acceptable or needed action taken, and a description of actions taken to correct an issue. All operation and maintenance walkthrough records must be documented using a Department form, a Department approved form, or submitted in a format as approved by the Department.