Section 61-79.264.K.226 - Monitoring and inspection
Current through Register Vol. 48, No. 9, September 27, 2024
(a) During construction and installation, liners [except in the case of existing portions of surface impoundments exempt from Section264.221(a)(a)] and cover systems (e.g., membranes, sheets, or coatings) must be inspected for uniformity, damage, and imperfections (e.g., holes, cracks, thin spots, or foreign materials). Immediately after construction or installation:
(b) While a surface impoundment is in operation, it must be inspected weekly and after storms to detect evidence of any of the following:
(c) Prior to the issuance of a permit, and after any extended period of time (at least six months) during which the impoundment was not in service, the owner or operator must obtain a certification from a registered engineer that the impoundment's dike, including that portion of any dike which provides freeboard, has structural integrity. The certification must establish, in particular, that the dike:
(d)