South Carolina Code of Regulations
Chapter 61 - DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
Subchapter 61-64 - X-Rays (Title B)
Part II - REGISTRATION OF X-RAY MACHINES AND SERVICES
Section 61-64.II.RHB 2.4 - Facility Registration Approval
Universal Citation: SC Code Regs 61-64.II.RHB 2.4
Current through Register Vol. 48, No. 9, September 27, 2024
2.4.1 In-State Facilities. Any facility planning to install an x-ray producing machine shall apply for Facility Registration Approval (FRA) prior to installation.
2.4.1.1 Applicants for
registration shall submit to the Department a completed application on a form
prescribed and provided by the Department prior to installation of x-ray
producing equipment. The applicant shall ensure the FRA application includes:
2.4.1.1.1 The full name, location address,
business email address, and mailing address of the facility for which the
registration is sought;
2.4.1.1.2
The name and signature of the Radiation Safety Officer, who is responsible for
radiation protection, and the individual's qualifications to serve in such a
capacity;
2.4.1.1.3 The full names
of any partners or co-owners, if applicable, as well as the full name of
corporate owners, if applicable;
2.4.1.1.4 The name, address, registration
number, and contact person of the company preparing the shielding plan, if
required by
RHB 4.4 or 8.13.2;
2.4.1.1.5 The name, address, registration
number, and contact person of the company selling and installing the equipment.
If more than one company is involved in the sale and/or installation, then the
above information shall be provided for all companies involved; and
2.4.1.1.6 The applicant's printed name,
title, and signature, assuring that the contents of the application are
accurate and true, and that the applicant will comply with this
regulation.
2.4.1.1.7 The
application shall include any additional information the Department determines
to be necessary for evaluation of the application for registration.
2.4.1.2 Prior to installation of
any x-ray producing equipment, the facility where the installation will be
shall submit any application and shielding review fees as required by
RHB 2.3.
2.4.1.3 Registration approval shall not be
granted until all required information has been deemed adequate by the
Department.
2.4.1.4 A facility
shall not install or cause to be installed any x-ray producing equipment until
approval has been granted.
2.4.2 Out-of-State Facilities. Any person proposing to bring x-ray producing equipment into the state, for any temporary use, shall apply for Facility Registration Approval (FRA).
2.4.2.1 Prior to possessing or utilizing
x-ray equipment in the state, the Out-of-State Facility shall submit to the
Department a completed application on a form prescribed and provided by the
Department prior to installation of an x-ray producing machine. The FRA
application shall include, at a minimum:
2.4.2.1.1 Facility name and mailing address
where correspondence may be sent;
2.4.2.1.2 The name and signature of the
Radiation Safety Officer, who is responsible for radiation protection, and the
individual's qualifications to serve in such a capacity;
2.4.2.1.3 Type and make of x-ray equipment to
be utilized;
2.4.2.1.4 An operating
schedule, indicating when and where the equipment will be used shall be
submitted to the Department five (5) calendar days prior to equipment use in
the state as required by
RHB 2.9;
2.4.2.1.5 A radiation area survey as required
by RHB 4.4 or
8.13.2;
2.4.2.1.6 The name,
address, registration number, and contact person of the company selling and
installing the equipment. If more than one company is involved in the sale or
installation, then the above information shall be provided for all companies
involved; and
2.4.2.1.7 The
applicant's printed name, title, and signature, assuring that the contents of
the application are accurate and true, and that the applicant will comply with
this regulation.
2.4.2.1.8 The
application shall include any additional information the Department determines
to be necessary for evaluation of the application for registration.
2.4.2.2 Prior to entering the
state, the Out-of-State Facility that will utilize the equipment shall submit
any application and shielding review fees as required by
RHB 2.3.
2.4.2.3 Approval shall not be granted until
the required application has been deemed adequate.
2.4.2.4 An Out-of-State Facility shall not
possess or utilize x-ray equipment in the state until approval has been
granted.
2.4.3 It shall be unlawful for any person to install x-ray producing equipment until the facility acquiring that equipment has been granted a Facility Registration Approval.
Disclaimer: These regulations may not be the most recent version. South Carolina may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.