South Carolina Code of Regulations
Chapter 61 - DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
Subchapter 61-12 - STANDARDS FOR LICENSING ABORTION CLINICS
Part VIII - DESIGN AND CONSTRUCTION
Section 61-12.VIII.803 - Submission of Plans and Specifications
Universal Citation: SC Code Regs 61-12.VIII.803
Current through Register Vol. 48, No. 9, September 27, 2024
A. New Buildings, Additions or Major Alterations to Existing Buildings. (II)
1.
When construction is contemplated either for new buildings, additions or major
alterations to existing buildings, the facility must contact the Division of
Health Facilities Construction of this Department to discuss code and
regulation requirements that apply to that project. Plans and specifications
shall be submitted to the Department for review. Where the Standard Building
Code or other regulations require fire-rated walls or other fire-rated
structural elements, these plans and specifications shall be prepared by an
architect registered in the State of South Carolina and shall bear his/her
seal.
2. All plans shall be drawn
to scale with the title and date shown thereon. Construction work shall not be
started until approval of the final drawings or written permission has been
received from the Department. Any construction changes from the approved
documents require approval by the Department.
B. Preliminary submission shall include the following:
1. Plot plan showing size and shape
of entire site; orientation and location of proposed building; location and
description of any existing structures, adjacent streets, highways, sidewalks,
railroads, et cetera, properly designated; size, characteristics and location
of all existing public utilities, including information concerning water supply
available for fire protection;
2.
Floor plans showing overall dimensions of buildings; locations, size and
purpose of all rooms; location and size of doors, windows and other openings
with swing of doors properly indicated; locations of smoke partitions and
firewalls; locations of stairs, elevators, dumbwaiters, vertical shafts and
chimneys;
3. Outline specifications
listing a general description of construction including interior finishes and
mechanical systems.
C. Final submission shall include the following: Complete working drawings and contract specifications, including layouts for plumbing, air conditioning, ventilation and electrical work and complete fire protection layout, if applicable.
D. In construction delayed for a period exceeding 12 months from the time of approval of final submission, a new evaluation and/or approval is required.
E. One complete set of as-built drawings shall be filed with DHEC.
Disclaimer: These regulations may not be the most recent version. South Carolina may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.