South Carolina Code of Regulations
Chapter 61 - DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
Subchapter 61-107 - Solid Waste Management
Subchapter 61-107.19 - SOLID WASTE. MANAGEMENT: SOLID WASTE LANDFILLS AND STRUCTURAL FILL
Part V - CLASS THREE LANDFILLS. (SUBSections A THROUGH F OF THIS PART ARE CODIFIED TO COINCIDE WITH THOSE SUBPARTS IN 40CFR258.)
Subpart F - CLOSURE AND POST-CLOSURE CARE
Section 61-107.19.V.F.258.61 - Post-closure Care Requirements
Current through Register Vol. 48, No. 9, September 27, 2024
a. Following closure of each Class Three landfill, the permittee shall conduct post-closure care. Post-closure care shall be conducted for a minimum 30 years, except as provided in paragraph b. below, and consist of at least the following:
b. The length of the post-closure care period may be:
c. The permittee of all Class Three landfills shall prepare a written post-closure plan that includes, at a minimum, the following information:
d. Prior to permit issuance, the permittee shall submit to the Department a post-closure plan for review and approval. The post-closure plan shall be updated if any changes occur at the facility which require a deviation from the approved post-closure plan.
e. Following completion of the post-closure care period for each Class Three landfill, the permittee shall submit to the Department, certification that is signed by a South Carolina registered professional engineer other than the design engineer, verifying that post-closure care has been completed in accordance with the post-closure plan.