South Carolina Code of Regulations
Chapter 61 - DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL
Subchapter 61-107 - Solid Waste Management
Subchapter 61-107.19 - SOLID WASTE. MANAGEMENT: SOLID WASTE LANDFILLS AND STRUCTURAL FILL
Part V - CLASS THREE LANDFILLS. (SUBSections A THROUGH F OF THIS PART ARE CODIFIED TO COINCIDE WITH THOSE SUBPARTS IN 40CFR258.)
Subpart C - OPERATING CRITERIA
Section 61-107.19.V.C.258.26 - Run-on/run-off Control Systems

Current through Register Vol. 48, No. 9, September 27, 2024

a. Owners/operators of all Class Three landfills shall design, construct, and maintain:

(1) A run-on control system to prevent flow onto the active portion of the landfill during the peak discharge from a 25-year storm; and,

(2) A run-off control system from the active portion of the landfill to collect and control at least the water volume resulting from a 24-hour, 25-year storm.

b. Run-off from the active portion of the landfill shall be handled in accordance with 258.27.a. below.

Disclaimer: These regulations may not be the most recent version. South Carolina may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.