A. Permit
Application Requirements.
1. Prior to the
construction, modification, or operation of an air curtain incineration
facility, a permit shall be obtained from the Department pursuant to these
regulations. The application shall be signed by an engineer duly licensed and
registered under the laws of the State of South Carolina.
2. Any person wishing to obtain a permit
pursuant to these regulations, to operate an air curtain incineration facility,
shall submit to the Department, one (1) printed copy and a digital copy of the
following documents:
a. A completed permit
application, on a form provided by the Department;
b. An operating report which shall include
the following:
(1) A detailed description of
the facility, including, but not limited to, structures, access roads, on-site
roads, parking areas, loading and unloading areas, storage areas for incoming
waste and non-combustible waste generated by the incinerator, fences, and
gates;
(2) A description of the
disposal location or any re-use or recycling planned for the ash
residue;
(3) A map showing the
specific location, land use, and zoning within one-fourth (1/4) mile of the
boundaries of the proposed facility, and distances to any locations from which
a buffer is required;
(4) A site
plan, on a scale of not greater than two hundred (200) feet per inch,
designating the property boundaries and all existing and proposed structures
and access roads;
(5) Detailed
engineering plans and specifications for the incinerator and other related
machinery; and,
(6) A description
of the manner in which waste waters, if any, from the facility will be
managed.
c. An itemized
closure cost estimate, prepared by a third party acceptable to the Department,
which projects the expenses for closure activities listed in the closure plan,
using cost estimates as calculated in accordance with Part IV.B.2 of this
regulation. The cost estimate will declare the maximum amount of incoming waste
and ash which may be located at a facility at any given time.
3. Public Noticing Requirements
for Air Curtain Incineration Facilities. Noticing for air curtain incineration
facilities shall be in accordance with Part III. A.3 of this regulation, except
that notice shall be given to the county administrator, the county planning
office, and all owners of real property as they appear on the county tax maps,
as contiguous landowners of the proposed permit area.
B. Design Requirements for Air Curtain
Incineration Facilities.
1. All facilities
shall be adjacent to or have direct access to roads that are of all-weather
construction and capable of withstanding anticipated load limits.
2. The active waste handling area of the
facility and burn trench shall have separation from the groundwater table at
all times.
3. No facilities shall
be located within the 100-year floodplain.
4. The active waste handling area of the
facility shall not be located within five hundred (500) feet of any waters of
the U.S.
5. All facilities shall be
in compliance with the U.S. Army Corps of Engineers and the U.S. Environmental
Protection Agency requirements concerning wetlands.
6. The active waste handling area of the
facility shall not extend closer than one hundred (100) feet to any drinking
water well.
7. Locations shall
allow for sufficient room to minimize traffic congestion and allow for safe
operation.
8. No facility shall
extend closer than one hundred (100) feet to any property line.
9. The active waste handling area of a
facility, shall not extend closer than five hundred (500) feet to residences,
schools, day-care centers, hospitals or recreational park areas.
10. Facilities shall adhere to all Federal
and State rules and regulations and all local zoning, land use and other
applicable local ordinances.
11.
Facilities shall be equipped with portable fire extinguishers, fire control
equipment and spill control equipment.
C. Operations Criteria for Air Curtain
Incineration Facilities.
1. Air curtain
incinerators may burn only clean wood, yard-trimmings and land-clearing debris
consisting of only untreated natural wood debris, untreated or unfinished wood
waste, or a mixture of these specific waste streams.
2. The operator shall restrict the presence
of, and shall minimize the possibility for any unauthorized entry onto the
facility. A statement of the days and hours of operation shall be posted at the
entrance of the facility and access, except for Department and/or emergency
personnel, shall be limited to those times when authorized personnel are on
duty.
3. Receipt and handling of
solid waste:
(a) The facility is authorized
to process only solid waste authorized by Department permit. The weight of all
solid waste received at the facility shall be recorded and incorporated into
the annual report.
(b) Storage
and/or processing of putrescible waste is prohibited.
(c) Wastes shall be stored so as to prevent a
fire hazard.
4. Trained
personnel shall be present at all times during the operation of the
facility.
5. The ash from all air
curtain incineration facilities shall be properly managed and disposed, as
approved in the facility permit, immediately after removal from the air curtain
incinerator.
D.
Reporting Requirements. Facilities with air curtain incinerators shall report
annually to the Department by October 15 for the previous fiscal year (July 1
through June 30), which includes at a minimum, the following information:
1. Total quantity in tons of solid waste
received at the facility for the previous fiscal year;
2. The county in South Carolina in which the
solid waste originated, or the state, if the waste originated outside South
Carolina;
3. The transfer station,
if applicable; and,
4. A
description of the method and quantities of the solid waste, ash, and
non-acceptable waste transported off-site for disposal or reuse or
recycling.
E. Closure
Requirements. All air curtain incineration facilities shall comply with the
closure and post-closure procedures as specified in Part IV.A of this
regulation.
F. Training
Requirements. All air curtain incineration facilities shall comply with
personnel training requirements in Part IV.C of this regulation.