South Carolina Code of Regulations
Chapter 121 - DEPARTMENT OF NATURAL RESOURCES
Section 121-8.13 - Plugging
Current through Register Vol. 48, 12, December 27, 2024
A. All oil wells or gas wells shall be plugged within thirty (30) days after temporary abandonment, unless special provisions have been approved by the Commission. Prior to commencing to plug or abandon any oil or gas well, the operator thereof shall notify the Commission orally and in writing of his intent to plug and abandon such well. Upon receiving approval, the operator shall be free to begin plugging said well provided the plugging shall be done in accordance with these rules and regulations. The Commission may send a duly authorized representative to the location specified, to be present at the time of plugging, and to observe the plugging of such well. Such representative shall have access to electrical logs and any other well records to determine if the proposed depths and lengths of plugs are adequate.
B. The method and procedure for plugging a well shall be as follows:
C. Within thirty (30) days after the plugging of any well, a plugging report shall be filed with the Commission setting forth in detail the method used in plugging the well. Such report shall be made on a form provided by the Commission.
D. Any hole permitted under Sections 121-8.4 and 121-8.5 of these regulations for seismic, core, or other exploratory purposes which penetrates below any freshwater formation shall be plugged in such manner as to properly protect all water bearing formations. Within ninety (90) days after such plugging, a report shall be filed with the Commission by the operator, setting forth the method used in protecting the water bearing formations in the plugging of such hole and the locations of the holes drilled and plugged.