South Carolina Code of Regulations
Chapter 103 - PUBLIC SERVICE COMMISSION
Article 3 - ELECTRIC SYSTEMS
Subarticle 3 - METERS
Section 103-324 - Meter Seal

Universal Citation: SC Code Regs 103-324
Current through Register Vol. 48, No. 3, March 22, 2024

Immediately after the pre-installation or field test of a meter, the manufacturer or the electrical utility shall affix a seal or locking device in order to avoid tampering. The meter installation shall be sealed or locked to help prevent tampering or theft of current.

Disclaimer: These regulations may not be the most recent version. South Carolina may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.