Rhode Island Code of Regulations
Title 650 - Coastal Resources Management Council
Chapter 20 - Coastal Management Program
Subchapter 00 - N/A
Part 5 - Metro Bay Region Special Area Management Plan
Section 650-RICR-20-00-5.13 - Compensation Options for Urban Coastal Greenway Requirements (formerly section 230)
Current through September 18, 2024
A. Compensation is required whenever an applicant reduces an Urban Coastal Greenway from the standard UCG width for the applicable zone or requests a variance under the UCG regulations. In addition, the applicant must still meet the general UCG requirements regarding shoreline features, vegetation targets, public access, and minimum width as listed in §5.5.1 of this Part. Similarly, the minimum 15% vegetation requirement and the stormwater management requirements for the development sites must be met in §5.5.1(A)(3) of this Part regardless of whether or not compensation options are utilized. Compensation options will be available at such time as the Rhode Island General Assembly establishes a compensation statute; reductions in regulatory requirements provided by the compensation provision are not available until the trust is set up.
B. The compensation requirements are intended to accommodate a continuous Urban Coastal Greenway around the urban coastline of Narragansett Bay, as articulated in Section 270 of the CRMC Metro Bay SAMP guidance document. Compensation options for a reduced UCG width may include: