5. All other projects (not identified herein,
including reviews conducted pursuant to § 20-00-1.3.3 of this Title):
a. Estimated Project Cost (EPC).
Determination of the EPC shall be based, where applicable, on the EPC accepted
by the building official subject to acceptance by the CRMC. The EPC shall
include all costs associated with site preparation (e.g., earthwork,
landscaping, etc.), sewage treatment and disposal (e.g., cost of an Onsite
Wastewater Treatment Systems (OWTS), sewer extension, sewer tie-in, etc.), and
construction costs (e.g., materials, labor, installation of all items necessary
to obtain a Certification of Occupancy, etc.). For projects where the
determination is not available, the EPC shall be provided by the applicant
subject to its acceptance by CRMC after review of the application. For an
individual homeowner project, this can be estimated based on the best
information available concerning the construction costs. Applicants for all
other types of projects shall provide documentation showing the basis on which
the EPC was determined. Where additional specificity in the documentation is
deemed necessary by CRMC staff, a written estimate by a qualified appraiser,
engineer, or architect will be supplied by the applicant.
(1) Projects with an (EPC) up to and
including five hundred dollars ($500.00) shall be assessed a twenty-five dollar
($25.00) application fee.
(2)
Projects with an (EPC) greater than five hundred dollars ($500.00) and less
than or equal to one thousand dollars ($1,000.00) shall be assessed a fifty
dollar ($50.00) application fee.
(3) Projects with an EPC greater than one
thousand dollars ($1,000.00) and less than or equal to two thousand five
hundred dollars ($2,500.00) will be assessed a one hundred dollar ($100.00)
application fee.
(4) Projects with
an EPC greater than two thousand five hundred dollars ($2,500.00) and less than
or equal to five thousand dollars ($5,000.00) will be assessed a one hundred
fifty dollar ($150.00) application fee.
(5) Projects with EPC greater than five
thousand dollars ($5,000.00) and less than or equal to ten thousand dollars
($10,000.00) will assessed a two hundred dollar ($200.00) application
fee.
(6) Projects with EPC greater
than ten thousand dollars ($10,000.00) and less than or equal to twenty-five
thousand dollars ($25,000.00) will assessed a two hundred fifty dollar
($250.00) application fee.
(7)
Projects with EPC greater than twenty-five thousand dollars ($25,000.00) and
less than or equal to fifty thousand dollars ($50,000.00) will assessed a five
hundred dollar ($500.00) application fee.
(8) Projects with EPC greater than fifty
thousand dollars ($50,000.00) and less than or equal to one hundred thousand
dollars ($100,000.00) will assessed a seven hundred fifty dollar ($750.00)
application fee.
(9) Projects with
EPC greater than one hundred thousand dollars ($100,000.00) and less than or
equal to one hundred fifty thousand dollars ($150,000.00) will assessed a one
thousand dollar ($1,000.00) application fee.
(10) Projects with EPC greater than one
hundred fifty thousand dollars ($150,000.00) and less than or equal to two
hundred thousand dollars ($200,000.00) will assessed a one thousand two hundred
fifty dollar ($1,250.00) application fee.
(11) Projects with EPC greater than two
hundred thousand dollars ($200,000.00) and less than or equal to two hundred
fifty thousand dollars ($250,000.00) will assessed a one thousand five hundred
dollar ($1,500.00) application fee.
(12) Projects with EPC greater than two
hundred fifty thousand dollars ($250,000.00) and less than or equal to three
hundred thousand dollars ($300,000.00) will assessed a one thousand seven
hundred fifty dollar ($1,750.00) application fee.
(13) Projects with EPC greater than three
hundred thousand dollars ($300,000.00) and less than or equal to three hundred
fifty thousand dollars ($350,000.00) will assessed a two thousand dollar
($2,000.00) application fee.
(14)
Projects with EPC greater than three hundred fifty thousand dollars
($350,000.00) and less than or equal to four hundred thousand dollars
($400,000.00) will assessed a two thousand two hundred fifty dollar ($2,250.00)
application fee.
(15) Projects with
EPC greater than four hundred thousand dollars ($400,000.00) and less than or
equal to four hundred fifty thousand dollars ($450,000.00) will assessed a two
thousand five hundred dollar ($2,500.00) application fee.
(16) Projects with EPC greater than four
hundred fifty thousand dollars ($450,000.00) and less than or equal to five
hundred thousand dollars ($500,000.00) will assessed a two thousand seven
hundred fifty dollar ($2,750.00) application fee.
(17) Projects with an EPC greater than five
hundred thousand dollars ($500,000.00) and less than or equal to twenty million
dollars ($20,000,000.00) will be assessed an application fee of two thousand
seven hundred fifty dollars ($2,750.00) plus one-half of one percent (0.5%) of
the EPC beyond five hundred thousand dollars ($500,000.00), to a maximum fee of
one hundred thousand two hundred and fifty dollars ($100,250.00).
(18) Projects with an EPC greater than twenty
million dollars ($20,000,000.00) will be assessed an application fee of one
hundred thousand two hundred fifty dollars ($100,250.00) plus one-fourth of one
percent (0.25%) of the EPC beyond twenty million dollars
($20,000,000.00).