2.7.1
EHB-1 Standard Boilers
The maximum allowable working pressure of standard boilers
shall in no case exceed the pressure indicated by the manufacturer's
identification stamped or cast on the boiler or on a plate secured to
it.
2.7.2
EHB-2
Nonstandard Riveted Boilers
The maximum allowable working pressure on the shell of a
nonstandard riveted heating boiler shall be determined in accordance with §
2.6.3 of this Part. Power Boilers, except that in no case shall the maximum
allowable working pressure of a steam heating boiler exceed 15 psi, or a hot
water boiler exceed 160 psi or 250 degrees Fahrenheit
temperature.
2.7.3
EHB-3 Nonstandard Welded Boilers
The maximum allowable working pressure of a nonstandard
steel or wrought iron heating boiler of welded construction shall not exceed 15
psi for steam. For other than steam service, the maximum allowable working
pressure shall be calculated in accordance with Section IV of the 2017 ASME
Code, but in no case shall it exceed 30 psi.
2.7.4
EHB-4 Nonstandard Cast Iron
Boilers
A. The maximum allowable
working pressure of a nonstandard boiler composed principally of cast iron
shall not exceed 15 psi for steam service or 30 psi for hot water
service.
B. The maximum allowable
working pressure of a nonstandard boiler having cast iron shell or heads and
steel or wrought iron tubes shall not exceed 15 psi for steam service or 30 psi
for hot water service.
2.7.5
EHB-5 Potable Water
Heaters
A potable water heater shall not be installed or used as a
heating boiler.
2.7.6
EHB-6 Safety Valves
A. Each steam
boiler shall have one or more ASME/National Board certified and stamped safety
valves of the spring pop-type adjusted and sealed to discharge at a pressure
not to exceed 15 psi. Seals shall be attached in a manner to prevent the valve
from being taken apart without breaking the seal. The safety valves shall be
arranged so that they cannot be reset to relieve at a higher pressure than the
maximum allowable working pressure on the boiler. A body drain connection below
seat level shall be provided by the manufacturer and this drain shall not be
plugged during or after field inspection. For valves exceeding 2 in. pipe size,
the drain hole or holes shall be tapped not less than 3/8 in. pipe size. For
valves less than 2 in., the drain hole shall not be less than 1/4 in. in
diameter.
B. No safety valve for a
steam boiler shall be smaller than 1/2 in. No safety valve shall be larger than
4-1 /2 in. The inlet opening shall have an inside diameter equal to, or greater
than, the seat diameter.
C. The
minimum relieving capacity of the valve or valves shall be governed by the
capacity marking on the boiler.
D.
The minimum valve capacity in pounds per hour shall be the greater of that
determined by dividing the maximum BTU output at the boiler nozzle obtained by
the firing of any fuel for which the unit is installed by 1000, or shall be
determined on the basis of the pounds of steam generated per hour per square
foot of boiler heating surface as given in § 2.7.6(D)(1) of this Part in text.
In many cases a greater relieving capacity of valves than the minimum specified
by these rules will have to be provided. In every case, the requirements shall
be met.
1. Table
MINIMUM POUNDS OF STEAM PER HOUR PER SQUARE FOOT
OF HEATING SURFACE
|
Firetube Boilers
|
Watertube Boilers
|
Boiler Heating Surface:
|
Hand Fired
|
5
|
6
|
Stoker fired
|
7
|
8
|
Oil, gas, or pulverized fuel fired
|
Waterwall Heating Surface:
|
Hand fired
|
8
|
8
|
Stoker fired
|
10
|
12
|
Oil, gas, or pulverized fuel
|
14
|
16
|
2.
When a boiler is fired only by a gas giving a heat value not in excess of 200
BTU per cu. ft., the minimum safety valve or safety relief valve relieving
capacity may be based on the value given for hand-fired boilers
above.
3. The minimum safety valve
or safety relief valve relieving capacity for electric boilers shall be 3-1/2
pounds per hour per kilowatt input.
4. For heating surface determination see 2017
ASME Code Section IV. paragraph HG-403.
E. The safety valve capacity for each steam
boiler shall be such that with the fuel burning equipment installed, and
operating at maximum capacity, the pressure cannot rise more than 5 psi above
the maximum allowable working pressure.
F. When operating conditions are changed, or
additional boiler heating surface is installed, the valve capacity shall be
increased, if necessary, to meet the new conditions and be in accordance with §
2.7.6 of this Part) in text. When additional valves are required, they may be
installed on the outlet piping provided there is no intervening
valve.
G. If there is any doubt as
to the capacity of the safety valve, an accumulation test shall be run. (See
2017 ASME Code, Section VI, Recommended Rules for Care and Operation of Heating
Boilers.)
H. No valve of any
description shall be placed between the safety valve and the boiler, nor on the
discharge pipe between the safety valve and the atmosphere. The discharge pipe
shall be at least full size and be fitted with an open drain to prevent water
lodging in the upper part of the safety valve or in the discharge pipe. When an
elbow is placed on the safety valve discharge pipe, it shall be located close
to the safety valve outlet or the discharge pipe shall be securely anchored and
supported. All safety valve discharges shall be so located or piped as not to
endanger persons working in the area.
2.7.7
EHB-7 Safety Relief Valve
Requirements for Hot Water Heating and Hot Water Supply Boilers
A. Each hot water heating and hot water
supply boiler shall have at least one ASME/National Board stamped and certified
safety relief valve set to relieve at or below the maximum allowable working
pressure of the boiler. Each hot water supply boiler shall have at least one
ASME/National Board stamped and certified safety relief valve of the automatic
reseating type set to relieve at or below maximum allowable working pressure of
the boiler. Safety relief valves ASME/National Board stamped and certified as
to capacity shall have pop action when tested by steam. When more than one
safety relief valve is used on either hot water heating or hot water supply
boiler, the additional valve or valves shall be ASME rated and may be set
within a range not to exceed 6 psi above the maximum allowable working pressure
of the boiler up to and including 60 psi and 5 percent for those having a
maximum allowable working pressure exceeding 60 psi. Safety relief valves shall
be spring loaded. Safety relief valves shall be so arranged that they cannot be
reset at a higher pressure than the maximum permitted by this
paragraph.
B. No materials liable
to fail due to deterioration or vulcanization when subject to saturated steam
temperature corresponding to capacity test pressure shall be used for any
part.
C. No safety relief valve
shall be smaller than 3/4 in. nor larger than 4-1/2 in. standard pipe size,
except that boilers having a heat input not greater than 15,000 BTU per hour
may be equipped with a safety relief valve of 1/2 in. standard pipe size. The
inlet opening shall have an inside diameter approximately equal to, or greater
than, the seat diameter. In no case shall the minimum opening through any part
of the valve be less than 1/4 in. in diameter or its equivalent area.
D. The required steam relieving capacity, in
pounds per hour, of the pressure relieving device or devices on a boiler shall
be the greater of that determined by dividing the maximum output in BTU at the
boiler nozzle obtained by the firing of any fuel for which the unit is
installed by 1,000 or shall be determined on the basis of pounds of steam
generated per hour per square foot of boiler heating surface as given in §
2.7.6(D)(1) of this Part. In many cases a greater relieving capacity of valves
will have to be provided than the minimum specified by these rules. In every
case, the requirements of § 2.7.7(F) of this Part shall be met.
E. When operating conditions are changed, or
additional boiler heating surface is installed, the valve capacity shall be
increased, if necessary, to meet the new conditions and shall be in accordance
with § 2.7.7(F) of this Part. The additional valves required, on account of
changed conditions, may be installed on the outlet piping provided there is no
intervening valve.
F. Safety relief
valve capacity for each boiler shall be such that, with the fuel burning
equipment installed and operated at maximum capacity, the pressure cannot rise
more than 10 percent above the maximum allowable working pressure for pressure.
When more than one safety relief valve is used, the over pressure shall be
limited to 10 percent above the set pressure of the highest set valve allowed
by § 2.7.6(A) of this Part in text.
G. If there is any doubt as to the capacity
of the safety relief valve, an accumulation test shall be run. (See 2017 ASME
Code, Section VI, Recommended Rules for Care and Operation of Heating
Boilers.)
H. No valve of any
description shall be placed between the safety relief valve and the boiler, nor
on the discharge pipe between the safety relief valve and the atmosphere. The
discharge pipe shall be not less than the diameter of the safety relief valve
and fitted with an open drain to prevent water lodging in the upper part of the
safety relief valve or in the discharge pipe. When an elbow is placed on the
safety relief valve discharge pipe, it shall be located close to the safety
relief valve outlet or the discharge pipe shall be securely anchored and
supported. All safety relief valve discharges shall be so located or piped as
not to endanger persons working in the area.
2.7.8
EHB-8 Steam Gages
A. Each steam boiler shall have a steam gage
or a compound steam gage connected to its steam space or to its water column or
to its steam connection. The gage or connection shall contain a siphon or
equivalent device which will develop and maintain a water seal that will
prevent steam from entering the gage tube. The connection shall be so arranged
that the gage cannot be shut off from the boiler except by a cock placed in the
pipe at the gage and provided with a tee or lever handle arranged to be
parallel to the pipe in which it is located when the cock is open. The
connections to the boiler shall be not less than 1/4 in. standard pipe size,
but where steel or wrought iron pipe or tubing is used, they shall be not less
than 1/2 in. standard pipe size. The minimum size of a siphon, if used, shall
be 1/4 in. in inside diameter. Ferrous and nonferrous tubing having inside
diameters at least equal to that of standard pipe sizes listed above may be
substituted for pipe.
B. The scale
on the dial of a steam boiler gage shall be graduated to not less than 30 psi
nor more than 60 psi. The travel of the pointer from 0 to 30 psi pressure shall
be at least 3 in.
2.7.9
EHB-9 Pressure or Altitude Gages and Thermometers
A. Each hot water boiler shall have a
pressure or altitude gage connected to it or to its flow connection in such a
manner that it cannot be shut off from the boiler except by a cock with tee or
lever handle, placed on the pipe near the gage. The handle of the cock shall be
parallel to the pipe in which it is located when the cock is open.
B. The scale on the dial of the pressure or
altitude gage shall be graduated approximately to not less than 1-1/2 nor more
than three times the pressure at which the safety relief valve is
set.
C. Piping or tubing for
pressure-or altitude-gage connections shall be of nonferrous metal when smaller
than 1 in. pipe size.
D. Each hot
water boiler shall have a thermometer so located and connected that it shall be
easily readable when observing the water pressure or altitude. The thermometer
shall be so located that it shall at all times indicate the temperature in
degrees Fahrenheit of the water in the boiler at or near the outlet.
2.7.10
EHB-10 Water Gage
Glasses
A. Each steam boiler shall have
one or more water gage glasses attached to the water column or boiler by means
of valved fittings not less than 1/2 in. pipe size, with the lower fitting
provided with a drain valve of a type having an unrestricted drain opening not
less than 1/4 in. in diameter to facilitate cleaning. Gage glass replacement
shall be possible under pressure. Water glass fittings may be attached directly
to a boiler.
B. Boilers having an
internal vertical height of less than 10 in. may be equipped with a water level
indicator of the Glass Bull's-Eye type provided the indicator is of sufficient
size to show the water at both normal operating and low water cutoff
levels.
C. The lowest visible part
of the water gage glass shall be at least 1 in. above the lowest permissible
water level recommended by the boiler manufacturer. With the boiler operating
at this lowest permissible water level, there shall be no danger of overheating
any part of the boiler.
D. Each
boiler shall be provided at the time of the manufacture with a permanent marker
indicating the lowest permissible water level. The marker shall be stamped,
etched, or cast in metal; or it shall be a metallic plate attached by rivets,
screws, or welding; or it shall consist of material with documented tests
showing its suitability as a permanent marking for the application. This marker
shall be visible at all times. Where the boiler is shipped with a jacket, this
marker may be located on the jacket.
E. In electric boilers of the submerged
electrode type, the water gage shall be so located to indicate the water levels
both at startup and under maximum steal load conditions as established by the
manufacturer.
F. In electric
boilers of the resistance heating element type the lowest visible part of the
water gage glass shall not be below the top of the electric resistance heating
element. Each boiler of this type shall also be equipped with an automatic
low-water electrical power cutoff so located as to automatically cut off the
power supply before the surface of the water falls below the top of the
electrical resistance heating elements.
G. Tubular water glasses on electric boilers
having a normal water content not exceeding 100 gal. shall be equipped with a
protective shield.
2.7.11
EHB-11 Stop Valves
A. When a stop valve is used in the supply
pipe connection of a single steam boiler, there shall be one used in the return
pipe connection.
B. Stop valves in
single hot water heating boilers shall be located at an accessible point in the
supply and return pipe connections as near the boiler nozzle as is convenient
and practicable, of a single hot water heating boiler installation to permit
draining the boiler without emptying the system.
C. When the boiler is located above the
system and can be drained without draining the system, stop valves may be
eliminated. A stop valve shall be used in each supply and return pipe
connection of two or more boilers connected to a common system.
D. All valves or cocks shall conform with the
applicable portions of HF-203 of Section IV of the 2017 ASME Code and may be
ferrous or nonferrous.
E. The
minimum pressure rating of all valves or cocks shall be at least equal to the
pressure stamped upon the boiler, and the temperature rating of such valves or
cocks, including all internal components shall be not less than 250 degrees
Fahrenheit.
F. Valves or cocks
shall be flanged, threaded or have ends suitable for welding or
brazing.
G. All valves or cocks
with stems or spindles shall have adjustable pressure type packing glands and,
in addition, all plug type cocks shall be equipped with a guard or gland. The
plug or other operating mechanism shall be distinctly marked in line with the
passage to indicate whether it is opened or closed.
H. All valves or cocks shall have tight
closure when under boiler hydrostatic test pressure.
I. When stop valves are used, they shall be
properly designated substantially by tags of metal or other durable material
fastened to them as follows:
1. Supply Valve -
Number ()
2. Do Not Close Without
Also Closing Return Valve - Number ()
3. Return Valve - Number ()
4. Do Not Close Without Also Closing Supply
Valve - Number ()
2.7.12
EHB-12 Feed-Water
Connections
A. Feed-water, makeup
water, or water treatment shall be introduced into a boiler through the return
piping system. Alternatively, makeup water or water treatment may be introduced
through an independent connection. The water flow from the independent
connection shall not discharge directly against parts of the boiler exposed to
direct radiant heat from the fire. Makeup water or water treatment shall not be
introduced through openings or connections provided for inspection or cleaning,
safety valve, safety relief valve, blow-off, water column, water gage glass,
pressure gage, or temperature gage.
B. The makeup water pipe shall be provided
with a check valve near the boiler and a stop valve or cock between the check
valve and the boiler or between the check valve and the return pipe
system.
2.7.13
EHB-13 Water Column and Water Level Control Pipes
A. The minimum size of ferrous or nonferrous
pipes connecting a water column to a steam boiler shall be 1 in. No outlet
connections, except for damper regulator, feed-water regulator, steam gages, or
apparatus which does not permit the escape of any steam or water except for
manually operated blow-downs, shall be attached to a water column or the piping
connecting a water column to a boiler (see HG-705 of Section IV of the 2017
ASME Code for introduction of feed-water into a boiler).If the water column,
gage glass, low-water fuel cutoff, or other water level control device is
connected to the boiler by pipe and fittings, no shutoff valves of any type
shall be placed in such pipe, and a cross or equivalent fitting to which a
drain valve and piping may be attached shall be placed in the water piping
connection at every right angle turn to facilitate cleaning. The water column
drain pipe and valve shall be not less than 3/4 in. pipe size.
B. The steam connections to the water column
of a horizontal Fire-tube wrought boiler shall be taken from the top of the
shell or the upper part of the head, and the water connection shall be taken
from a point not above the center line of the shell. For a cast iron boiler,
the steam connection to the water column shall be taken from the top of an end
section or the top of the steam header, and the water connection shall be made
on an end section not less than 6 in. below the bottom connection to the water
gage glass.
2.7.14
EHB-14 Return Pump
Each boiler equipped with a condensate return pump shall be
provided with a water level control arranged to automatically maintain the
water level in the boiler within the range of the gage glass.
2.7.15
EHB-15 Repairs and Renewals of
Fittings and Appliances
Whenever repairs are made to fittings or appliances, or it
becomes necessary to replace them, the repairs must comply with Section IV of
the 2017 ASME Code for new construction.