Section 75.31 - Applicability
Current through Register Vol. 54, No. 38, September 21, 2024
The interconnection procedures apply to customer-generators with small generator facilities that satisfy the following criteria:
(1) The electric nameplate capacity of the small generator facility is equal to or less than 5 MW.
(2) The small generator facility is not subject to the interconnection requirements of an RTO.
(3) The small generator facility is designed to operate in parallel with the electric distribution system.
The provisions of this § 75.31 amended under 66 Pa.C.S. § § 501, 1501 and 2807(e); and sections 1648.7(a) and 1648.3(e)(2) of the Alternative Energy Portfolio Standards Act of 2004 (73 P.S. § § 1648.7(a) and 1648.3(e)(2)).
This section cited in 52 Pa. Code § 69.2101 (relating to statement of scope); 52 Pa. Code § 69.2102 (relating to statement of purpose); and 52 Pa. Code § 69.2104 (relating to interconnection application fees).