Section 69.17 - Critical period procedures
Current through Register Vol. 54, No. 38, September 21, 2024
(a) A critical period exists when the NGDC declares an Operational Flow Order (OFO). A critical period implies the need for heightened awareness and attention by all parties.
(b) The NGDC should describe in detail, in its tariff, the actions it will take in advance of, and during a critical period. At a minimum, those actions should include the following: