Section 57.105 - Construction monitoring program
Current through Register Vol. 54, No. 38, September 21, 2024
(a) A utility which is involved in the construction of an electric generating unit as defined by 66 Pa.C.S. § 515(d) (relating to construction cost of electric generating units) but is not the construction manager of the electric generating unit, shall have a construction monitoring program. A description of the construction monitoring program shall be filed with the Commission when the utility files its construction cost estimate under 66 Pa.C.S. § 515(a) as prescribed by § 57.103 (relating to estimate of construction costs).
(b) A utility which is required to file a description of its construction monitoring program shall include the following in the description:
(c) Although a noncontrolling owner may not have the authority to establish or change the construction management procedures, the owner shall monitor the progress of construction and, if necessary, take action to compel the construction manager to use prudent and proper management procedures.
The provisions of this §57.105 issued under Public Utility Code, the Public Utility Code, 66 Pa.C.S. § § 501, 515, 1301 and 1308.