Pennsylvania Code
Title 52 - PUBLIC UTILITIES
Part I - Public Utility Commission
Subpart C - Fixed Service Utilities
Chapter 57 - ELECTRIC SERVICE
Subchapter B - SERVICE AND FACILITIES
Section 57.16 - Records of system load and operation
Current through Register Vol. 54, No. 38, September 21, 2024
(a) Records required. A public utility shall keep in continuous operation meters and instruments and maintain records necessary to determine the characteristics of the system load and the mode of operation.
(b) Content of records. Records of load and operation shall include all of the following:
(c) Records of electric energy transactions. A public utility purchasing, selling or interchanging electric energy or power from, to, or with another public utility under the jurisdiction of the Commission shall install such instruments and meters as may be necessary to furnish continuous records of the energy and demand involved, unless such other public utility has itself installed such instruments and meters from which these records may be obtained. A public utility purchasing, selling, or interchanging electric energy or power from, to, or with a utility not under the jurisdiction of the Commission shall install or cause to be installed such instruments and meters as may be necessary to furnish continuous records of the energy and demand involved.
The provisions of this §57.16 issued under the Public Utility Code, 66 Pa.C.S. § § 331, 501, 504 and 1501.