Section 7.31 - Submission and approval of plans
Current through Register Vol. 54, No. 38, September 21, 2024
(a) No elevator, dumbwaiter, escalator, gravity elevator, hoist or manlift shall be constructed and installed without a permit from the Department. The architect, contractor, owner or manufacturer responsible for such installations shall file with the Department plans in triplicate, each showing the location of the machinery and equipment together with an application for a permit in duplicate, on forms provided by the Department. Such plans shall specify the capacity and the car speed of the installation, the weight of the car complete, car controlling mechanism, type of limit stops and switches, diameter of sheaves, size, number and material of hoisting and counterweight cables, type of speed governor and safeties, overhead and pit clearance, type of buffers, machine and overhead grating, the weight of the machine if overmounted, the material, quality and spans of overhead supporting members, and the construction of shaftway gates or doors, and car gates or doors, where required.
(b) Each set of plans submitted to the Department for an elevator permit for work to be accomplished in a new or existing hoistway in an existing structure shall bear the seal and signature of an architect or engineer licensed in this Commonwealth, together with his certification on the drawing to the following statement:
I have examined and checked the building structure or building plans surrounding this elevator hoistway, pit and machine room and hereby certify it is adequate for the loads to be imposed on it and is in accord with applicable laws and regulations of this Commonwealth.
(c) An exception exists as regards oil-electric or hydraulic elevators designed for class A freight loading or passenger loading. In lieu of the above certification on the elevator plans, a letter which shall accompany the request for elevator permit from the architect or engineer on his letterhead and bearing his seal and signature together with the above certification will be acceptable. Such letter shall identify in detail the elevator drawing in question including final revisions.
(d) Before work is commenced on the removal, or repair of existing installations, duplicate applications for the work shall be filed with the Department for approval, and a permit for the work obtained.
This section cited in 34 Pa. Code § 7.71 (relating to conflicts); 34 Pa. Code § 7.134 (relating to approval and operation); 34 Pa. Code § 7.174 (relating to approval and operation); 34 Pa. Code § 7.213 (relating to approval and operation); 34 Pa. Code § 7.251 (relating to general); and 34 Pa. Code § 7.291 (relating to general).