Section 3a.98 - Plan approval
Current through Register Vol. 54, No. 38, September 21, 2024
(a) Installation of a boiler must comply with all of the requirements of this section.
(b) A boiler owner shall submit an intent to install form or other data showing compliance with the act and this chapter to the Department before a boiler is installed.
(c) A boiler owner shall submit drawings and a request for a variance to the Industrial Board if the installation clearances do not meet the requirements of § 3a.36 (relating to clearances). Drawings must be at least 18 inches by 24 inches in size drawn to a scale of not less than 1/4 inch equals 1 foot. Drawings for boiler installations must include the following:
This section cited in 34 Pa. Code § 3a.22 (relating to other State stamps).