(a)
Sewerage. The following activities conducted in conjunction
with sewerage project development and construction are not eligible for
financial assistance:
(1) Costs of acquisition
or construction of interior plumbing and that portion of house laterals that is
neither owned by, nor the responsibility of, the applicant wastewater
system.
(2) Projects that have not
secured planning and permit approvals under Chapters 71, 91 and 92 (relating to
administration of sewage facilities planning program; general provisions; and
National Pollutant Discharge Elimination System permitting, monitoring and
compliance).
(3) Costs associated
with the purchase of land that is not a component in the collection process or
the physical, biological or chemical treatment process or are costs which would
not qualify as "eligible costs" under §
963.11(a)(4)
(relating to eligible costs).
(4)
Legal or professional fees associated with litigation of a Commonwealth
enforcement action.
(5) Costs
associated with replanning or redesign subsequent to loan approval except where
unforeseeable site conditions discovered during construction require replanning
or redesign. The applicant/borrower shall demonstrate to the Authority that
extensive effort was made in examining site conditions before planning and
design were finalized. The Authority may also approve replanning or redesign
costs if the replanning or redesign would result in cost savings sufficient, in
the Authority's judgment, to justify those costs.
(6) Costs associated with the development of
an approvable official sewage plan under the Pennsylvania Sewage Facilities Act
(35
P. S. §§ 750.1-750.20).
(7) Costs associated with the extraction for
profit of minerals or other resources from wastewater or sludges unless, in the
case of public facilities, the profits from the extraction will be used solely
to reduce system user costs.
(b)
Industrial wastewater.
The following activities conducted in conjunction with industrial wastewater
project development and construction are not eligible for financial assistance:
(1) Costs of acquisition or construction of
interior plumbing.
(2) Projects
which have not secured planning and permit approvals under Chapters 91 and
92.
(3) Costs associated with the
purchase of land that is not a component in the collection process or the
physical, biological or chemical treatment process or costs which would not
qualify as eligible costs under § 963.11(a)(4).
(4) Legal or professional fees associated
with litigation of a Commonwealth enforcement action.
(5) Costs associated with replanning or
redesign subsequent to financial assistance approval except where unforeseeable
site conditions discovered during construction requires replanning or redesign.
The applicant/borrower shall demonstrate to the Authority that extensive effort
was made in examining site conditions before planning and design were
finalized.
(6) Costs associated
with the extraction for profit of minerals or other resources from wastewater
or sludges.
(c)
Water systems. The following activities conducted in
conjunction with water project development and construction are not eligible
for financial assistance:
(1) Projects or
those portions of projects not related to a water system.
(2) Costs of acquisition or construction of
interior plumbing and fixtures.
(3)
Costs associated with the purchase of land that is not a component in the
collection, treatment or distribution process; or are costs which would not
qualify as eligible costs under § 963.11(a)(4).
(4) Legal or professional fees associated
with litigation of a Commonwealth enforcement action.
(5) Projects for water systems which are not
in compliance with requirements established under the Pennsylvania Safe
Drinking Water Act (35 P. S. §§ 721.1-721.17) unless the purpose of the
project is to bring the water system into compliance.
(6) Costs associated with replanning or
redesign subsequent to loan approval except where unforeseeable site conditions
discovered during construction require replanning or redesign. The
applicant/borrower shall demonstrate to the Authority that extensive effort was
made in examining site conditions before planning and design were
finalized.
(d)
Stormwater projects. The following costs associated with
stormwater projects development are not eligible for financial assistance:
(1) Costs associated with a stormwater
project located within a watershed for which a county has not adopted a
watershed stormwater management plan, as required by the Storm Water Management
Act, shall be ineligible for financial assistance under the act, except that:
(i) Costs associated with a project within a
watershed which includes land in more than one county and for which the
Department has required that a joint plan for the entire watershed be submitted
by the affected counties shall be ineligible for financial assistance under the
act only if any county in which the project is located is found to have failed
to cooperate in the development of the joint plan.
(ii) A stormwater project specifically
designed to maintain or improve, or both, existing water quality and to comply
with the National Pollutant Discharge Elimination System (NPDES) stormwater
permitting requirements shall be eligible for financial support under the
act.
(iii) Costs associated with a
project located in a municipality which has enacted a stormwater management
ordinance requiring land owners and persons engaged in the alteration or
development of land to implement measures to ensure that the maximum rate of
stormwater runoff is no greater after the development than prior to development
activities or to manage the quantity, velocity and direction of resulting
stormwater runoff in a manner which otherwise adequately protects the health
and property of residents from the possibility of injury as required by the
Storm Water Management Act shall be eligible for financial support under the
act.
(2) Costs associated
with a stormwater project located within a municipality which is not
implementing ordinances under an existing county-prepared and
Department-approved watershed plan.
(3) Costs associated with a project in which
work is done within the stream, including activities such as
widening/realignment of channel, improvements along banks and bed of the
channel and increasing capacity of the channel.
(4) Costs associated with projects or those
portions of projects not related to a stormwater system as determined by
project staff. The staff determination will be submitted to the applicant in
writing.
(5) Costs associated with
legal or professional fees directly related to litigation of a Commonwealth
enforcement action.
(6) Costs
associated with projects for stormwater systems which are not in compliance
with the requirements established under the Storm Water Management Act unless
the purpose of the project is to bring the stormwater system into
compliance.
(7) Costs associated
with replanning or redesign subsequent to loan approval except where
unforeseeable site conditions discovered during construction require replanning
or redesigning. The applicant/borrower shall demonstrate to the Authority that
extensive effort was made in existing site conditions before planning and
design were finalized. The Authority may also approve replanning and redesign
costs if the replanning or redesign would result in cost savings sufficient, in
the Authority's judgment, to justify those costs.