SOIL AND WATER
Section 281.132 - Soil erosion and sedimentation control plan

Universal Citation: 25 PA Code ยง 281.132

Current through Register Vol. 54, No. 44, November 2, 2024

(a) The applicant shall submit a plan to manage surface water and control erosion during all phases of construction and operation at the facility. The plan shall be based on the requirements of Chapter 102 (relating to erosion control), § 281.252 (relating to soil erosion and sedimentation control) and other applicable State and Federal requirements. Calculations indicating water quantities shall be based on the 24-hour precipitation event in inches to be expected once in 25 years. More stringent design standards may be required by the Department based on the most recent edition of the United States Department of Agriculture Soil Conservation Services' Engineering Field Manual for Conservation Practices.

(b) The plan shall include fully dimensioned diversion ditches, indicating length, gradient and cross section for configuration by reach, and capacities for ditch volume by reach. Calculations which are necessary to support design and siting shall be included in the plan.

Disclaimer: These regulations may not be the most recent version. Pennsylvania may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.