Pennsylvania Code
Title 25 - ENVIRONMENTAL PROTECTION
Part I - Department of Environmental Protection
Subpart D - Environmental Health and Safety
Article VIII - Municipal Waste
Chapter 273 - MUNICIPAL WASTE LANDFILLS
Subchapter C - OPERATING REQUIREMENTS
CLOSURE PROVISIONS
Section 273.322 - Closure
Current through Register Vol. 54, No. 44, November 2, 2024
(a) The operator shall implement the closure plan approved by the Department under § 273.192 (relating to closure plan).
(b) At least 180 days before implementation of a closure plan, the operator shall review its approved closure plan to determine whether the plan requires modification, and shall submit proposed changes to the Department for approval under § 271.222 (relating to permit modification).
(c) If groundwater degradation exists at closure or occurs after closure, a person shall meet one of the following:
(d) An application for a closure plan modification shall include the following:
(e) After closure, the Department may modify, in accordance with § 271.144 (relating to public notice and public hearings for permit modifications), the frequency of monitoring for a parameter for which quarterly monitoring is required under § 273.284 (relating to sampling and analysis) to a semi-annual frequency if the operator demonstrates the following:
(f) The Department may modify the frequency of monitoring for a parameter for which semi-annual monitoring was approved under subsection (e) to an annual basis if the results of semi-annual monitoring continue to demonstrate the following:
(g) The Department may reinstate the requirement of quarterly monitoring for any parameter monitored under subsection (e) or (f) if the Department has reason to believe that the parameter may cause or contribute to groundwater degradation.